4.6.3 Sizing

See the design guidance provided above for sizing of individual components of permeable pavement and Appendix C: Sizing of LID Facilities for an overview of the step-by-step process to be used to size LID BMPs for flow control. The text below in Section 4.6.4: Runoff model representation provides additional guidance specific to modeling of runoff from permeable pavement facilities.


Previous Section  |  Next Section