Tell Us About Your LID Project

RETURN TO MAP >

Contact Information

Project Title* 

Project Manager* 

Organization* 

Contact Address* 

Contact State* 

Contact Phone* 

Contact City* 

Contact Zip* 

Contact Email* 


Project Information

Enter a brief purpose statement for your project
(250 characters or less)* 

Start Date* 

Does your project include a monitoring component?

Monitoring Timeline
(ie: pre, post, annual, monthly, and date range)

Scale* 

Enter the scope of your project
(500 characters or less)* 

Completion Date

If yes, what parameters are you measuring?

Project Setting* 


What LID element(s) does your project include? To complete the form select at least one item.

If 'Other' please explain:


Project Location

Address* 

State* 

City* 

Zip* 


Rain Garden

* Required if the Rain Garden checkbox is checked

Contributing rain garden size (sq ft)*

Existing soil infiltration rate (in/hr)*

Bioretention soil mix composition*

Bioretention soil depth (inches)*

Is there an underdrain?

Additional rain garden information


Permeable Pavements

* Required if the Permeable Pavement checkbox is checked

Type of permeable pavements used*

Aggregate base composition used*

Underdrain Used

Additional permeable pavement information

Existing soil infiltration rate at pavement location (in/hr)*

Total depth required (inches)*

Runon from contributing area (sq ft)


Greenroofs

* Required if the Greenroof checkbox is checked

Greenroof type

System used

Surface area (sq ft)*

Depth of green roof (inches)

Plant pallette

Additional greenroof information


Rainwater Harvesting

* Required if the Rainwater Harvesting checkbox is checked

Is water potable/non-potable

Size of storage (gallons)*

Filtration used

Use of harvested rainwater*

Contributing impervious area (if applicable, sq ft)

Additional rainwater harvesting information


Documents

Document 1

Document 1 Label

Document 2

Document 2 Label

Document 3

Document 3 Label

Photo 1

Photo 1 Label

Photo 2

Photo 2 Label

Submit