MS4 Permit E&O Requirements for 2024 – 2029:

WWA Phase I Draft 2024 – 2029 WWA Phase II Draft 2024 EWA Phase Draft II
S5.C.11 Public Education and Outreach S5.C.2 Public Education and Outreach S5.B.1 Public Education and Outreach
The SWMP shall include an E&O program designed to:
• Build general awareness about methods to address and reduce stormwater runoff.
• Effect behavior change to reduce or eliminate behaviors and practices that cause or contribute to adverse stormwater impacts.
• Create stewardship opportunities that encourages community engagement in addressing the impacts from stormwater runoff.
Permittees may choose to meet these requirements individually or as a member of a regional group. Regional collaboration on general awareness or behavior change programs, or both, includes Permittees developing a consistent message, determining best methods for communicating the message, and when appropriate, creating strategies to effect behavior change. If a Permittee chooses to adopt one or more elements of a regional program, the Permittee should participate in the regional group and shall implement the adopted element(s) of the regional program in the local jurisdiction The SWMP shall include an E&O program designed to:
• Build general awareness about methods to address and reduce impacts from stormwater runoff.
• Effect behavior change to reduce or eliminate behaviors and practices that cause or contribute to adverse stormwater impacts. AND
• Create stewardship opportunities that encourages community engagement in addressing the impacts from stormwater runoff.
Permittees may choose to meet these requirements individually or as a member of a regional group. Regional collaboration on general awareness or behavior change programs, or both, includes Permittees developing a consistent message, determining best methods for communicating the message, and when appropriate, creating strategies to effect behavior change. If a Permittee chooses to adopt one or more elements of a regional program, the Permittee should participate in the regional group and shall implement the adopted element(s) of the regional program in the local jurisdiction. Permittees shall implement a public education and outreach program designed to educate the priority audiences about the impacts of stormwater discharges to water bodies and the steps to take to reduce pollutants in stormwater. Outreach and educational efforts should include a multimedia approach and shall be targeted and presented to specific audiences for increased effectiveness. The education program may be developed and implemented locally or regionally.
Based on the priority audience’s demographic, the Permittee shall consider delivering selected messages in language(s) other than English.
Minimum performance measures: The minimum performance measures are: The minimum performance measures are:
a. Each Permittee shall implement an education and outreach program. The program design shall be based on local or regional (or both) water quality information and priority audience characteristics to identify high priority audiences, subject areas, and/or BMPs. Based on the priority audience’s demographic, the Permittee shall consider delivering its selected messages in language(s) other than English, as appropriate for the priority audience. a. Each Permittee shall implement an education and outreach program. The program design shall be based on local or regional (or both) water quality information and priority audience characteristics to identify high priority audiences, subject areas, and/or BMPs. Based on the priority audience’s demographic, the Permittee shall consider delivering its selected messages in language(s) other than English, as appropriate to the target audience. a. All Permittees shall continue to implement a public education and outreach program designed to reach priority audiences identified in i-iii below and achieve improvements in the priority audiences’ understanding of the problem and what they can do to solve it. The program shall, at a minimum address the following, based on the land uses and priority audiences found within the community. Permittees shall provide subject area information to the priority audience on an ongoing or strategic schedule.
i. General awareness: Permittees shall build general awareness with the following audiences and subject areas: i. General awareness. To build general awareness, Permittees shall annually select at a minimum one priority audience and one subject area from either (a) or (b): i. Priority audiences: General public, including homeowners, teachers, school-age children, University/college or Trade Students and overburdened communities. Provide information about the following subject areas:
a) The importance of improving water quality and protecting beneficial uses of waters of the State.
b) The potential impacts from stormwater discharges.
c) Methods for avoiding, minimizing, reducing, and/or eliminating the adverse impacts of stormwater discharges.
d) Actions individuals can take to improve water quality, including encouraging participation in local environmental stewardship activities and programs.

WWA Phase I Draft 2024 – 2029 WWA Phase II Draft 2024 EWA Phase Draft II
S5.C.11 Public Education and Outreach S5.C.2 Public Education and Outreach S5.B.1 Public Education and Outreach
(a) Priority Audiences: General Public (including school age children, college/university or trade students and overburdened communities), and businesses (including home-based and mobile business). Subject areas:
• General impacts of stormwater on surface waters, including impacts from impervious surfaces and of the hazards associated with illicit discharges and improper disposal of waste.
• LID principles and LID BMPs. (a) Priority audiences: General public (including overburdened communities, school age children, college/university, or trade students or businesses (including home-based, or mobile businesses). Subject areas: • General impacts of stormwater on surface waters, including impacts from impervious surfaces. or
• Low impact development (LID) principles and LID BMPs. ii. Priority audiences: Businesses. Provide information, appropriate to the type of business, about:
a) Preventing illicit discharges, including what constitutes illicit discharges (e.g., Source Control BMPs to prevent illicit discharges).
b) The impacts of illicit discharges.
c) Promoting the proper management and disposal of waste.
d) Management of dumpsters and washwater.
e) The use and storage of automotive chemicals, hazardous cleaning supplies, carwash soaps, and other hazardous materials.
(b) Priority audiences: Engineers, contractors, developers, property owners/managers and land use planners. Subject areas: Technical standards for stormwater site and erosion control plans.
• LID principles and LID BMPs.
• Stormwater treatment and flow control BMPs/facilities.
Source control BMPs for building materials to reduce pollution to stormwater, including but not limited to stormwater pollution from PCB‐containing materials (b) Priority audiences: Engineers, contractors, developers, property owners/managers or land use planners. Subject areas:
• Technical standards for stormwater site and erosion control plans.
• LID principles and LID BMPs.
• Stormwater treatment and flow control BMPs/facilities or
Source control BMPs for building materials to reduce pollution to stormwater, including but not limited to stormwater pollution from PCB‐containing materials. i. Priority audiences: Engineers, construction contractors, developers, property owners/managers, development review staff, land use planners. Provide information about:
a) Technical standards, development of SW site plans, TESC plans
b) Infiltration and underground injection control criteria.
c) Low Impact Development (LID).
d) Stormwater Best Management Practices (BMPs) for reducing adverse impacts from stormwater runoff from development sites.
e) Municipal stormwater code requirements.
(f) Source control BMPs for building materials to reduce pollution to stormwater including, but not limited to, stormwater pollution from PCB‐containing materials.
(c) Permittees shall provide subject area information to the priority audience on an ongoing or strategic schedule. (c) Permittees shall provide subject area information to the priority audience on an ongoing or strategic schedule.
ii. Behavior change: To effect behavior change, Permittees shall select, at a minimum, one priority audience and one BMP: ii. Behavior change. To affect behavior change, Permittees shall select, at a minimum, one priority audience and one BMP.
(a) Priority audiences: Residents, landscapers, and property
managers/owners, school-age children, college/university or trade students and businesses (including home-based and mobile businesses). BMPs include:
• Use and storage of automotive chemicals, hazardous cleaning supplies, carwash soaps, and other hazardous materials. • Prevention of illicit discharges.
• Yard care techniques protective of water quality.
• Use/storage of pesticides & fertilizers & other household chemicals.
• Carpet cleaning.
• Repair/maintenance BMPs for vehicles, equipment, home buildings.
• Pet waste management and disposal.
• LID principles and LID BMPs.
• Stormwater facility maintenance, including LID facilities
• Dumpster and trash compactor maintenance.
• Litter and debris prevention.
• (Audience specific) Source Control BMPs, including PCB’s in building materials.
• (Audience specific) Locally important, SW-related subject area. (a) Priority Audiences: Residents, landscapers, property managers/owners, developers, school age children, college/university or trade students or businesses (including home-based or mobile businesses). BMPs include:
• Use/storage of: pesticides, fertilizers, other household chemicals.
• Use/storage of: automotive chemicals, hazardous cleaning supplies, carwash soaps, and/or other hazardous materials.
• Prevention of illicit discharges.
• Yard care techniques protective of water quality.
• Carpet cleaning.
• Repair/maintenance BMPs: vehicles, equipment, home/buildings.
• Pet waste management and disposal.
• LID Principles and LID BMPs.
• Stormwater facility maintenance, including LID facilities.
• Dumpster and trash compactor maintenance.
• Litter and debris prevention.
• Sediment and erosion control.
• (Audience specific) Source control BMPs (refer to S5.C.8). or
• (Audience specific) Locally-important, municipal SW-related subject area.

WWA Phase I Draft 2024 – 2029 WWA Phase II Draft 2024 – 2029 EWA Phase ll Draft 2024 – 2029
S5.C.11 Public Education and Outreach S5.C.2 Public Education and Outreach S5.B.1 Public Education and Outreach
iii. No later than July 1, 2025, each Permittee shall evaluate the effectiveness of the ongoing behavior change program (required under S5.C.11.a.ii of the 2019 Permit). Permittees shall document lessons learned and recommendations for which option to select from S5.C.11.a.iv. Permittees that select option S5.C.11.a.iv.c, below, may forgo this evaluation if it will not add value to the overall behavior change program. (b) No later than July 1, 2025, each Permittee shall evaluate the effectiveness of an ongoing behavior change campaign (required under S5.C.1.a.ii and S5.C.1.c of the 2019 Permit). Permittees shall document lessons learned and recommendations for which option to select from S5.C.2.a.ii.(c).
Permittees that select option S5.C.2.a.ii.(c)3, below, may forgo this evaluation if it will not add value to the overall behavior change program.
iv. Based on the recommendation from S5.C.11.a.iii, by July 1, 2026, each Permittee shall follow social marketing practices and methods, and develop a campaign that is tailored to the community, including the development of a program evaluation plan. Each Permittee shall: (c) Based on the recommendation from S5.C.2.a.ii.(b), by July 1, 2026, each Permittee shall follow social marketing practices and methods, and develop a campaign that is tailored to the community, including development of a program evaluation plan. Each Permittee shall:
(a) Develop a strategy and schedule to implement the existing campaign more effectively, or 1. Develop a strategy and schedule to more effectively implement the existing campaign; or
(b) Develop a strategy and schedule to expand the existing campaign to a new priority audience or BMPs, or 2. Develop a strategy and schedule to expand the existing campaign to a new priority audience or BMPs; or
( c) Develop a strategy and schedule for a new priority audience and BMP behavior change campaign. 3. Develop a strategy and schedule for a new priority audience and BMP behavior change campaign.
v. No later than September 1, 2026, begin to implement the strategy developed in S5.C.11.a.iv. (d) No later than September 1, 2026, begin to implement the strategy developed in S5.C.2.a.ii.(c)
vi. No later than March 31, 2029, evaluate and report on: (e) No later than March 31, 2029, evaluate and submit a report on:
(a) The changes in understanding and adoption of targeted behaviors resulting from the implementation of the strategy; and 1. The changes in understanding and adoption of targeted behaviors resulting from the implementation of the strategy; and
2. Any planned or recommended changes to the campaign to be more effective; describe the strategies and process to achieve the results. b. Each Permittee shall measure the understanding and adoption of the priority behaviors for at least one target audience in at least one subject area. No later than December 31, 2026, Permittees shall use the resulting measurements to direct ongoing education and outreach resources most effectively, as well as to evaluate changes in adoption of the targeted behaviors. Document program evaluation process and how resources will direct effective methods and implementation of the ongoing education and outreach program.
c. No later than January 1 2027, each permittee shall begin to provide and/or advertise stewardship opportunities to encourage residents or businesses to participate in activities or events planned and organized within the community such as: stream teams, storm drain marking, volunteer monitoring, and riparian plantings. Permittees may partner and/or promote stewardship opportunities created or organized by existing organizations (including non-permittees).
(b) Any changes to the campaign to be more effective; describe the strategies and process to achieve the results.
vii. Permittees shall use results of the evaluation to continue to direct effective methods for implementation of the ongoing behavior change program. (f) Permittees shall use results of the evaluation to continue to direct effective methods and implementation of the ongoing behavior change program.
b. Each Permittee shall partner and promote (or both) stewardship opportunities to encourage residents or businesses to participate in activities or events planned and organized within the community, such as: stream teams, storm drain marking, volunteer monitoring and riparian plantings .Permittees may partner or promote (or both) stewardship opportunities created or organized by existing organizations (including non- permittees). iii. Stewardship. Each Permittee shall partner and promote stewardship opportunities to encourage residents to participate in activities or events planned and organized within the community, such as: stream teams, storm drain marking, volunteer monitoring, and riparian plantings. Permittees may partner or promote (or both) stewardship opportunities created or organized by existing organizations (including non‐permittees).1
The minimum performance measures are: i. Annually, Permittees shall document specific public involvement opportunities provided to overburdened communities. ii. No later than December 31, 2026, document methods used to identify overburdened communities.
b. Each Permittee shall post on their website their SWMP plan and the Annual Report, required under S9.A, no later that May 31 each year. All other submittals shall be available to the public upon request.

WSC Landing Page for Eastern WA E&O Construction Site Pollution Prevention Documents

Summary: Eastern WA E&O Documents

Audience:
The EWA SW E&O Workgroup identified the need for better outreach to three audiences.
1) Planners, Engineers, and Review Staff – Brochure
2) Contractors and Construction Crews – Flipbook
3) Developers –Brochure
Description:
1) Planners, Engineers, and Review Staff Brochure: The goal is to ensure efforts to prevent and correct some of the most commonly observed surface water concerns on construction sites are made early on in the permitting process. It provides information to assist in meeting municipal stormwater permit requirements with topics essential to stormwater design: site control plans, low-impact development, underground injection controls, infiltration, and best management practices (BMPs). A QR code is provided to access further information in the Department of Ecology’s Stormwater Manuals.
2) Construction Flip Book: This was created for the contractors and construction crews. The goal was something small enough to fit in the glove box and that could be printed on a more durable paper to withstand construction site use. It contains information about temporary erosion and sediment control (TESC), low-impact development (LID), underground injection control (UIC), and best management
practices (BMPs). It also provides a QR code that allows easy access to information in the Dept. of Ecology’s stormwater manuals with a cell phone.
3) The final brochure will be focused on Developers, with a slightly higher perspective. The goal is to encourage thoughtful planning for stormwater issues early on in the process. It will be available by the end of September.

Flip Book for Construction Contractors

Summary: Flip Book Information Template for Municipal Construction Managment Overview for Construction Contractors, Eastern Washington outreach and education for municipal stormwater management, photos of construction

Add Logo(s) and delete text
Municipal Stormwater
Management Overview
For ConstrucÆŸon Contractors
TABLE OF CONTENTS
Purpose & Disclaimer
Temporary Erosion & Sediment Control
· SWPPP
· TESC Tips
· Site Log Book
· Good Housekeeping
· Prohibited Discharge
· Perimeter Controls
· Stabilize Site
· Inlet and Outlet ProtecƟon
· Establish Site Access
Low Impact Development (LID)
· Why is LID important?
· LID Principles
Underground InjecÆŸon Control (UIC)
· Why are UICs Important?
Best Management PracÆŸces (BMPs)
· Why are BMPs important?
· Common BMPs
Municipal Stormwater Codes
PURPOSE & DISCLAIMER
The purpose of this flip book is to assist in the
protecÆŸon of water quality from sources of polluÆŸon.
This booklet contains informaÆŸon about temporary
erosion and sediment control (TESC), low impact
development (LID), underground injecÆŸon control
(UIC), and best management pracÆŸces (BMPs). This
informaÆŸon includes ways to prevent and correct
some of the most commonly observed concerns on
construcÆŸon sites as well as the importance of each
pracÆŸce.
This document does not include all possible pracÆŸces
but rather highlights some of the most common. For
more informaÆŸon, reference the weblinks on the back
page of this document.
TEMPORARY EROSION &
SEDIMENT CONTROL (TESC)
Temporary Erosion and Sediment Control Plans
outline pracƟces for prevenƟng sediment runoff from
construcÆŸon sites through the use of man-made
structures, land management techniques, or natural
processes. The ConstrucÆŸon Stormwater General
Permit requires a CerƟfied Erosion and Sediment
Control Lead (CESCL) to inspect sites. The link below
provides more informaÆŸon about becoming a CESCL.
This secÆŸon provides highlights from the CESCL
training course.
hƩps://ecology.wa.gov/RegulaƟons-Permits/Permits-
cerƟficaƟons/CerƟfied-erosion-sediment-control
Replace and/or delete items in
green text on the cover as well as
pages 35 and 36 with information
that is specific to your jurisdiction.
Then change text color to black.
WHY IS TESC IMPORTANT?
UnmiÆŸgated site development can result in soil
erosion that can adversely impact adjacent property,
infrastructure, and environmental and recreaÆŸonal
resources. EffecƟve erosion and sediment control
(ESC) BMPs on construcÆŸon sites can greatly reduce
undesirable environmental impacts and costs.
MunicipaliÆŸes may apply escalaÆŸng enforcement
measures to developers who fail to implement proper
erosion and sediment control procedures. Not
complying with municipal codes can result in project
delays, fines, or even imprisonment.
SWPPP
A stormwater pollution prevention plan (SWPPP) details the
BMPs used to avoid environmental loss and degradation
from poorly managed construction activity. A TESC plan
must address the following elements, which are consistent
with the thirteen SWPPP elements outlined in Special
Condition S9 of Ecology’s Construction Stormwater General
Permit and in Chapter 7 Construction Stormwater Pollution
Prevention of the Ecology Stormwater Management
Manual for Eastern Washington (SWMMEW).
· Element 1: Mark Clearing Limits
· Element 2: Establish ConstrucƟon Access
· Element 3: Control Flow Rates
· Element 4: Install Sediment Controls
· Element 5: Stabilize Soils
· Element 6: Protect Slopes
· Element 7: Protect Drain Inlets
· Element 8: Stabilize Channels and Outlets
· Element 9: Control Pollutants
· Element 10: Control Dewatering
· Element 11: Maintain BMPs
· Element 12: Manage Project
· Element 13: Protect LID BMPs
TESC TIPS
1. Budget for Temporary BMPs
Purchase – InstallaÆŸon – Maintenance – Removal
Factor in labor costs.
2. Grade and Excavate in Dry Season
Dry season is May 1st – October 1st
Phase construcÆŸon to preserve naÆŸve
vegetaÆŸon and reduce exposure.
3. Use Your SWPPP
Review – Reference – Revise
Keep SWPPP posted on-site at all ÆŸmes.
4. Keep Up-to-Date Records
Log Books – Reports – Maintenance – InspecÆŸon
Forms
Required by Department of Ecology and
JurisdicÆŸons
5. Protect Permanent Stormwater Controls
Ponds – Treatment Systems – Low Impact
Development (LID)
Reduce the need for maintenance at final
inspecÆŸon.
SITE LOG BOOK
Keep ongoing records of:
Changes to TESC plans
BMP implementaÆŸon
BMP maintenance or replacement
Visual inspecÆŸons
All relevant field notes
Spill informaÆŸon (date, ÆŸme, amount, locaÆŸon,
material, clean-up method, noƟficaƟons made,
and disposal)
Discharge monitoring reports (DMRs) and
sampling
GOOD HOUSEKEEPING
Keep site clean.
Regularly inspect and maintain BMPs.
Cover and store hazardous materials (use
secondary containment).
Use concrete washout controls.
Follow solid waste BMPs.
Hold regular tailgate check-ins with crew.
Have spill kit on site.
Looking for photos to go here
PROHIBITED DISCHARGE
· Untreated construction stormwater over 25 NTUs
· Washout from concrete (slurry), stucco, paint,
and concrete form release oils
· Soaps or solvents used for vehicle or equipment
washing
· Equipment leaks and toxic substances from a spill
· Wheel wash wastewater
· Sediment track-out from vehicles
PERIMETER CONTROLS
Proper installaÆŸon is key:
– Key in and backfill to prevent runoff from
going under silt fences.
– Space support posts a maximum of 6 feet
apart.
– Overlap adjacent fence secƟons generously
to prevent escape of runoff.
Mark project area correctly.
Perform required maintenance.
Add BMP reinforcement for sites with high flow
or wind potenÆŸal.
Select BMPs by filtraƟon and retenƟon needs.
Consider public safety.
Use BMPs in combinaÆŸon.
STABILIZE SITE
Minimize exposed areas.
Preserve naÆŸve vegetaÆŸon.
Phase grading and excavaÆŸon.
Minimize slope length and pitch whenever
possible.
Stabilize slopes.
Cover stockpiles.
Use BMPs in combinaÆŸon.
INLET AND OUTLET PROTECTION
Install early in project.
Perform required maintenance; inspect regularly.
Inlet ProtecÆŸon BMPs:
Inserts/socks
Coir pads
Bio-bags/sand bags
Compost socks
Outlet ProtecÆŸon BMPs:
– Rip rap
– Sediment fence
– WaƩles/socks/sand bags
Use protecÆŸon BMPs as last line of defense.
ESTABLISH SITE ACCESS
Install stabilized pad 12-inch thick of 4-inch to
8-inch quarry spalls, or a 4-inch course of asphalt
treated base, or use exisÆŸng pavement at all site
entrances and exits.
Install geotexÆŸle fabric underlayment beneath
spalls.
Do not use crushed concrete.
Use wheel wash when a stabilized pad fails to
prevent sediment track-out.
Sweep track-out as necessary (at least daily).
Inspect site access regularly, especially aÅŒer large
storm events.
LOW IMPACT DEVELOPMENT (LID)
Low impact development applies stormwater
and land use management approaches that strive
to imitate natural processes by emphasizing
conservaÆŸon, uÆŸlizing on-site natural features,
site planning, and distributed stormwater
management pracÆŸces in the project’s design.
Developers are encouraged to use LID techniques
and non-structural methods to minimize impervious
surfaces and disturbing naÆŸve soils and vegetaÆŸon.
Factor in site condiÆŸons and long-term maintenance
when considering using LID approaches.
ConstrucÆŸon Stormwater General and Municipal
Permit Requirements:
Use and maintain erosion and sediment controls
on areas that drain to infiltraƟon BMPs. Restore
BMPs by removing sediment and, if applicable,
replace sediment-laden soils with those meeÆŸng
the BMP’s design specificaÆŸons.
LOW IMPACT DEVELOPMENT (CONT.)
Keep construcƟon equipment and foot traffic off
infiltraƟon BMPs to avoid compacƟon. Similarly,
protect landscaped and protected natural areas
from compacÆŸon by construcÆŸon equipment.
Clean permeable pavements fouled with
sediments as well as those failing SWMMEW or
manufacture infiltraƟon tests.
WHY IS LID IMPORTANT?
LID improves stormwater management and protects
surface waters. Installing LID systems can result in
cleaner air and water, as well as enhance flood
protecÆŸon, habitat, and green spaces.
LID may help meet or, in some cases, completely
saƟsfy Ecology’s requirements for runoff water
quality treatment (Core Element #5) and flow
control (Core Element #6).
LID PRINCIPLES
Follow the key principles of LID for site design,
construcÆŸon, and long-term maintenance:
Preserve naÆŸve vegetaÆŸon.
Protect criÆŸcal areas (e.g., wetlands, groundwater
recharge areas, flood-prone areas, geologically
unstable areas, and habitat conservaÆŸon areas).
Minimize surfaces that prevent water from
seeping into the ground.
Minimize disturbance and compacÆŸon of site
soils.
Preserve exisƟng flow paths.
Infiltrate stormwater runoff.
Disperse stormwater.
UÆŸlize natural surfaces.
UÆŸlize small-scale, distributed LID BMPs.
UNDERGROUND INJECTION CONTROL (UIC)
Stormwater Underground InjecÆŸon Control wells
are structures used to direct stormwater runoff
underground, usually under the force of gravity.
UIC wells consist of:
A hole whose depth exceeds its largest surface
dimension.
An underground fluid distribuƟon system (e.g.,
perforated pipes or dry wells) to distribute the
stormwater below ground.
WHY ARE UICS IMPORTANT?
UIC wells are another approach to managing
stormwater runoff, which includes the added benefit
of replenishing groundwaters. As such, federal and
state regulaÆŸons govern the use of UIC wells to
prevent groundwater contaminaÆŸon. UIC wells not
designed, operated, and maintained according to
these laws may result in penalÆŸes, including
prevenÆŸng further use of the well.
WHY ARE UICS IMPORTANT? (CONT.)
UIC wells require frequent inspecÆŸon and
preventaÆŸve maintenance to ensure they perform as
intended. As such, UIC wells require protecÆŸon from
runoff with sediment generated during construcƟon
as it could quickly prevent infiltraƟon. If necessary,
remove debris and sediment to eliminate the buildup
of materials that could prevent infiltraƟon. Also see
Inlet and Outlet ProtecÆŸon on Page 11 for addiÆŸonal
ways to protect drywells during construcÆŸon.
BEST MANAGEMENT PRACTICES (BMPS)
Best Management PracÆŸces consist of measures,
approved by the Department of Ecology, used to
prevent or reduce the release of pollutants and other
adverse impacts (e.g., high flows) to surface and
groundwaters. ConstrucÆŸon stormwater BMPs may
be used individually or required in combinaÆŸon. They
can be structural (e.g., silt fence, wheel wash, seƩling
ponds) or nonstructural (e.g., street sweeping, source
control polluÆŸon prevenÆŸon measures, maintenance
procedures, prohibited pracÆŸces).
This secÆŸon introduces common BMPs uÆŸlized during
construcÆŸon. InformaÆŸon about the BMPs included in
this document can be found at the QRL
code on this page. QRL codes for each
BMP are provided on the subsequent
pages, with more informaÆŸon about
installaÆŸon and maintenance pracÆŸces.
WHY ARE BMPS IMPORTANT?
Unmanaged runoff during a project’s construcÆŸon
phase can harm surface and groundwaters,
vegetaÆŸon, habitat, property, and infrastructure.
Avoiding these harms requires pre-project planning,
including the gathering of site-specific informaƟon
based on the site’s characterisÆŸcs. It also requires
ongoing site awareness and diligence during the
construcÆŸon phase, including monitoring weather
forecasts, proper installaÆŸon and maintenance
of BMPs, and polluÆŸon prevenÆŸon pracÆŸces.
CollecÆŸvely, these acÆŸons can contribute to
reducing construcÆŸon-related impacts on the site
and surrounding areas.
Used properly, BMPs provide erosion and sediment
control, provide polluÆŸon prevenÆŸon, minimize
unwanted compacƟon, and protect on- and off-site
infrastructure, property, and natural areas.
COMMON BMPS
BMP C233E Silt Fence
Silt fence reduces the transport
of coarse sediment from a
construcÆŸon site by providing
a temporary physical barrier to
sediment and reducing the runoff
velociƟes of overland flow.
COMMON BMPS (CONT.)
BMP C106E Wheel Wash
Wheel washes reduce the amount of
sediment transported onto paved
roads by washing dirt from the wheels
of motor vehicles prior to the motor
vehicles leaving the construcÆŸon site.
COMMON BMPS (CONT.)
BMP C105E Stabilized ConstrucÆŸon Access
Stabilized construcÆŸon entrances
reduce the amount of sediment
transported onto paved roads by
vehicles or equipment. This is done by
construcÆŸng a stabilized pad of quarry
spalls at entrances and exits for
construcÆŸon sites.
COMMON BMPS (CONT.)
BMP C107E ConstrucÆŸon Road / Parking Area
StabilizaÆŸon
Stabilizing roads, parking areas, and
other on-site vehicle transportaÆŸon
routes immediately aÅŒer grading re-
duces erosion caused by construcÆŸon
traffic or stormwater runoff.
COMMON BMPS (CONT.)
BMP C103E High-Visibility Fence
High-visibility fencing:
Restricts clearing to approved
limits;
Prevents disturbance of sensiÆŸve
areas, their buffers, and other
areas required to be leŌ
undisturbed;
Limits construcƟon traffic to designated
construcÆŸon entrances, exits, or internal roads;
and
Protects areas where marking with survey tape
may not provide adequate protecÆŸon.
COMMON BMPS (CONT.)
BMP C235E WaƩles
WaƩles are temporary erosion and
sediment control barriers consisÆŸng of
straw, compost, or other material that
is wrapped in biodegradable tubular
plasÆŸc or similar encasing material.
They reduce the velocity and can
spread the flow of rill and sheet runoff and
can capture and retain sediment.
COMMON BMPS (CONT.)
BMP C209E Outlet ProtecÆŸon
Outlet protecÆŸon prevents scour at
conveyance outlets and minimizes the
potenÆŸal for downstream erosion by
reducing the velocity of concentrated
stormwater flows.
COMMON BMPS (CONT.)
BMP C201E Grass Lined Channels
Grass lined channels are channels with
a vegetaÆŸve lining for conveyance of
runoff to help prevent the transport
of sediment and erosion.
COMMON BMPS (CONT.)
BMP C202 Riprap Channel Lining
Riprap channel lining is used when
natural soils or vegetated stabilized
soils in a channel are not adequate
to prevent channel erosion.
COMMON BMPS (CONT.)
BMP C241E Sediment Pond (Temporary)
Sediment ponds are temporary ponds
used during construcÆŸon to remove
sediment from runoff originaƟng from
disturbed areas of the site. Sediment
ponds are typically designed to
remove sediment no smaller than
medium silt (0.02 millimeters). Consequently,
they usually reduce turbidity only slightly.
COMMON BMPS (CONT.)
BMP C207E Check Dams
ConstrucÆŸon of check dams across
a swale or ditch reduces the velocity
of concentrated flow and dissipates
energy at the check dam.
COMMON BMPS (CONT.)
BMP C101E Preserving Natural VegetaÆŸon
The purpose of preserving natural
vegetaÆŸon is to reduce erosion
wherever pracÆŸcable. LimiÆŸng site
disturbance is the single most effecƟve
method for reducing erosion. For
example, conifers can hold up to about
50% of all rain that falls during a storm. Up to 20% to
30% of this rain may never reach the ground but is
taken up by the tree or evaporates. Another benefit is
that the rain held in the tree can be released slowly
to the ground aÅŒer the storm.
COMMON BMPS (CONT.)
BMP C162 Scheduling
Sequencing a construcÆŸon project can
reduce the amount and duraÆŸon of
soil exposed to erosion by wind, rain,
runoff, and vehicle tracking.
MUNICIPAL STORMWATER CODES
The EWA MS4 Phase II Permit requires implemenÆŸng
and enforcing programs to reduce pollutants in
stormwater from construcÆŸon acÆŸviÆŸes that disturb
one…

Yakima County Construction Trackout Brochure

CONSTRUCTION TRACK OUT 2018 Guidance Yakima County Public Services Water Resources 128 N. 2nd St. Fourth Floor Courthouse Yakima, WA 98901 PLACE STAMP HERE Photo: Effective and Ineffective Track Out Pads ___________________ ___________________ ___________________ ___________________ Wash Pit or Wheel Washing System The wash pit integrates the Trackout plates with an effective and efficient wheel washing system that helps remove debris from tires and the undercarriages of vehicles. While it may take a little longer to assemble, it is the best system for long term or high debris traction projects. Why BMPs Are Important? They are effective management practices for reducing pollution within our stormwater systems. Below are two websites where you can learn more about BMPs and how they can be constructed. • https://www.yakimacounty.us/1748/Best-ManagementPractices-BMPs • https://www.wastormwatercenter.org/constructionstormwater-general-permit Trackout BMP Controls There are several different types of Best Management Practice (BMP) controls to choose from that will assist in the reduction or complete elimination of Trackout. Examples below: Trackout Pad A stabilized constructed entrance, designed to remove debris from the tires as vehicles leave a construction site. Requirements for the construction of an effective trackout pad are: • 15 Feet Wide (Minimum) • 100 Feet Long (Recommended) • 4-8 Inch Quarry Spalls • 12 Inch Thickness *See back of brochure for example. Trackout Plate / Grizzly’s® A device using rails, pipes, or grates that dislodge debris from the tires and undercarriage prior to leaving a construction site. This device is usually reusable and can easily be assembled and transported. Paving While it might not be as cost effective, paving is an effective method of sediment control. A paved surface must extend at least 100 feet back from the point of the intersection with a paved public roadway and be a minimum width of at least 20 feet. What Is Trackout? Trackout is dirt, mud, or other debris tracked onto a paved public roadway by a vehicle leaving a construction site. Dirt and mud is adhered to the exterior or undercarriage of the vehicle leaving the construction site, which then deposits the dirt, mud, and other debris onto the roadway. Trackout is also a source for particulate matter (PM10) and is a regulated air pollutant. Why Is It Important To Control? Soil sediment that leaves the construction site contributes directly to the degradation of air and water quality. As rainfall and other vehicles pass over the sediment, it is either washed into the storm drains or lifted into the atmosphere. Is it the Law? YES Yakima County Code, 12.10—Stormwater Authority • http://www.codepublishing.com/WA/YakimaCounty/ Contact Us Yakima County Public Services Water Resources Division 128 N. 2nd St. Fourth Floor Courthouse Yakima, WA 98901 Phone: (509) 574-2300 Fax: (509) 574-2301 Web: http://www.yakimacounty.us/ Photo: Grizzly incorporated into the Trackout Pad BMP. Photo: Rain for Rent on-site Wheel Washing System.

Yakima County Construction Trackout Brochure (Spanish)

CONSTRUCCIÓN PI S TA H A C I A F U E RA 2018 Dirección Yakima County Public Services Water Resources 128 N. 2nd St. Fourth Floor Courthouse Yakima, WA 98901 PLACE STAMP HERE ___________________ ___________________ ___________________ ___________________ *Spanish Translation by Microsoft Translator Software Un excelente ejemplo de una entrada de construcción estén correctamente instalados. (Source: Asotin County) Buena instalación de una entrada de la construcción, pero el sedimento se rastrean todavía fuera del sitio. Agregar más rockero o hacer la entrada más larga. (Source: Douglas County) Foto: Eficaces e ineficaces pista a cojines Español Foso de lavado La fosa de lavado integra las placas Pista Hacia Fuera con un sistema de lavado eficaz y eficiente que ayuda a eliminar residuos de llantas y el chasis de los vehí culos. Mientras que puede tardar un poco ma s para montar, es el mejor sistema para largo plazo o proyectos de traccio n de alta suciedad. ¿Por qué son importantes los BMPs? Son pra cticas de gestio n eficaces para reducir la contaminacio n dentro de nuestros sistemas de aguas pluviales. A continuacio n se muestran dos sitios web donde se pueden aprender ma s sobre ordenacio n y co mo pueden construirse. • http://www.yakimacounty.us/1748/Best-ManagementPractices-BMPs • http://www.wastormwatercenter.org/constructionstormwater-general-permit/ Controles de Pista Hacia Fuera BMP Hay varios tipos diferentes de controles de la mejor pra ctica de manejo (BMP) para elegir que va ayudar en la reduccio n o eliminacio n completa de las Pista Hacia Fuera. Ejemplos a continuacio n: Almohadilla Pista Hacia Fuera Una entrada estabilizada construida, disen ada para eliminar los residuos de los neuma ticos como vehí culos dejan una obra de construccio n. Requisitos para la construccio n de una almohadilla eficaz: • 15 pies de ancho (mí nimo) • 100 pies largo (recomendado) • 4-8 pulgadas cantera Escoda • Creo que de 12 pulgadas * Ver por ejemplo la parte trasera del folleto. Placa Pista Hacia Fuera / Grizzly de Un dispositivo que usa rieles, tubos o rejillas que desalojar los escombros de los neuma ticos y tren de aterrizaje antes de salir de un sitio de construccio n. Este dispositivo es generalmente reutilizable y se puede fa cilmente montar y transportar. Pavimentación Mientras que no sea tan rentable, pavimentacio n es un me todo eficaz de control de sedimentos. Una superficie pavimentada debe ampliar por lo menos 100 pies desde el punto de interseccio n con una carretera pu blica pavimentada y ser de una anchura mí nima de al menos 20 pies. ¿Qué es Pista Hacia Fuera? Pista Hacia Fuera es la suciedad, barro u otros residuos rastreados en una carretera pu blica pavimentada por un vehí culo dejando una obra de construccio n. Suciedad y el barro se adhiere al exterior o al tren de aterrizaje del vehí culo dejando el sitio de construccio n, que luego se deposita la suciedad, lodo y otros escombros en la carretera. Pista Hacia Fuera es tambie n una materia particulada (PM10) y es un contaminante de aire regulada. ¿Por qué es importante controlar? Sedimentos de suelo que deja la obra contribuyen directamente a la degradacio n de la calidad del aire y agua. Como lluvias y otros vehí culos pasan el sedimento lavado en las alcantarillas o levantado en la atmo sfera. ¿Es la ley? SÍ County Code 12.10—Autoridad de aguas pluviales • http://www.codepublishing.com/wa/yakimacounty/ Contact Us Yakima County Public Services Atención: Water Resources 128 N. 2nd St. Fourth Floor Courthouse Yakima, WA 98901 Teléfono: (509) 574-2300 Fax: (509) 574-2301 Web: http://www.yakimacounty.us/ Foto: Grizzly incorporado en la Pista Hacia Fuera almohadilla Foto: Rain for Rent on-site Wheel Washing System.

WSC Web Landing Page for Municipal Construction Resources

Summary: Municipal Construction Resources

Purpose of the Permit:
The requirements of this stormwater management permit regulates the discharge of pollutants from construction projects to protect water quality in Washington State. The permit authorizes the discharge of stormwater and authorized non-stormwater associated with construction activity. The permit is a combined NPDES and State Waste Discharge Permit that limits the discharge of pollutants to surface waters.
Applying for Coverage under the Permit:
Construction sites covered under the existing permit that reapplied for permit coverage will be covered under the new permit. New or unpermitted construction sites may obtain coverage under the permit by submitting a complete permit application to Ecology and satisfying all applicable public notice and State Environmental Policy Act requirements.
Apply Online for Permit Coverage.
Your Right to Appeal:
You have a right to appeal the final general permit and the general permit coverage for a specific facility to the Pollution Control Hearings Board (PCHB). Any appeal must be filed within 30 days of the issuance date of January 1, 2021.
Appeals of the general permit issuance or must be filed within 30 days of issuance of the general permit. See the
Appeal of the General Permit Focus Sheet
for more information.
Appeals of the general permit coverage for a specific facility must be filed within 30 days of the effective date of coverage. See the
Appeal of a General Permit Coverage Focus Sheet
for more information.