PCBs are a class of 209 synthetic compounds used widely in industrial and commercial applications until their manufacture was banned by the Toxic Substances Control Act (TSCA) in 1979 PCBs can still be found in buildings constructed or renovated between 1950 and 1979. They were intentionally added to building materials to improve flexibility, adhesion, and durability Some sources include caulk, paints, grout, sealants + many more PCBs are regulated by the EPA and are increasingly a serious liability for building owners If sources of PCBs contamination go unchecked they can cause: Serious health problems like cancer Construction delays Unexpected costs However, proper testing and remediation can help you avoid these negative effects Like dealing with lead and asbestos, there are measures you can take to address the threats posed by PCBs: 1) Consult guidance from the WA State Department of Ecology before starting demolition or renovation on buildings at risk of containing PCBs 2) Avoid activities like pressure washing until your building’s exterior has been tested for PCBs Learn about more BMPs at : [INSERT LINK] The Washington State Department of Ecology provides a guide on PCBs for building owners and managers who want to learn more and get started on addressing PCBs. Scan the QR code to learn more about how you can protect your building, your tenants, and our environment.
Resource Type: Forms & Templates
Ecology forms such as NOIs, sample update forms, inspection logs, worksheets, checklists.
PCB Property owner Flyer Template
Widely used in building materials from 1950-1979, polychlorinated biphenyls (or PCBs) are an unhealthy chemical that can harm both building occupants and the local environment. You can learn more about what materials may contain this toxic and the next steps to protect your building(s), your tenants, and the environment using tools from the Washington Department of Ecology and the Environmental Protection Agency. Scan this QR code to learn more about risks, requirements, and best management practices for addressing PCBs in your building! Publicly-available records indicate that your building at [INSERT ADDRESS] may contain PCBs. This project has been funded wholly or in part by the United States Environmental Protection Agency under assistance agreement PC-01J95801-2 to the Washington State Department of Ecology. The contents of this document do not necessarily reflect the views and policies of the Environmental Protection Agency, nor does mention of trade names or commercial products constitute endorsement or recommendation for use. Questions? Contact emmade
Attention Property Owners Digital PCB Flyer
. Concerned about the risks associated with PCBs and curious about how you can protect your investment and your tenants? Sign up to receive FREE, one-on-one guidance about available resources and easy steps you can take to start addressing this issue in your building(s).PCBs (or polychlorinated biphenyls) are a class of toxic compounds used widely
in industrial and commercial applications to improve flexibility, adhesion, and
durability. Though their manufacture and use was banned in 1979, PCBs can still
be found in buildings constructed or renovated between 1950 and 1979 in
materials like caulk, paints, grout, sealants, as well as many more.PCBs are regulated by the EPA and are increasingly a
serious liability for building owners. Various state and
federal regulations prohibit the use or release of PCBs into
the environment. Know if your building is at risk of containing
PCBs and take action before you accidentally incur fines!Don’t get caught off guard! If you’re planning a construction,
renovation or demolition project, test proactively to avoid
additional costs, delays, and protect human and
environmental health.
WW Phase II 2024-2029 Timeline of deliverable due dates
Summary: 2024 – 2029 Permit, Compliance Timelines, Year by year compliance guideline, deadlines, compliance by permit condition
The timeline below provides an overview of major program deadlines for implementing permit requirements of S5 Stormwater Management Program
(SWMP) and S8 Monitoring and Assessment for Continuing City, Town, and County Permittees (By Date means “no later than…â€). This is guidance only.
Table paraphrases requirements and does not include all ongoing program elements. Please see the permit for additional details and related
requirements.
S5 Permit
Components
Ongoing
Program
Implementation
2024
2025
2026
2027
2028
2029
A. Stormwater
Management
Plan
Annually update
& submit the
SWMP with
Annual Report
(S9)
– A.3.a. Cost
tracking: track
the cost of
development and
implementation
of each
component of
the SWMP
– A.3.b. activity
tracking: track #
of inspections,
follow up
actions, official
enforcement,
public ed
activities
By March 31
(ongoing from
this year
forward):
Submit the
(estimated) cost
of development
and
implementation
of each
component of
the SWMP and
sources of
funding.
S5 Permit
Components
Ongoing
Program
Implementation
2024
2025
2026
2027
2028
2029
A.5
Coordination
Ongoing
coordination
By March 31:
Submit
description of
internal
coordination
mechanisms
among
departments.
C.1
Stormwater
Planning
Ongoing
-Continue to
convene
interdisciplinary
team
-Assess and
report LID code-
related
requirements.
March 31:
Respond to
series of Annual
Report (AR)
questions for
coordination of
long-range plans
during this
permit term
Submit
completed
SMAP for new
catchment area,
or additional
actions for
existing SMAP.
By Dec 31:
Adopt and
implement tree
canopy
goals/policies to
support
stormwater
management.
S5 Permit
Components
Ongoing
Program
Implementation
2024
2025
2026
2027
2028
2029
C2. Public
Education &
Outreach
Ongoing:
Implementation
of ed & o
outreach
programs and
stewardship
By July 1:
Follow Social
Marketing
methodology to
develop strategy
and schedule
for new or
modiï¬ed
campaign.
By Sept 1:
Begin to
implement
strategy
By March 31:
Submit report
on evaluation of
behavior change
campaign.
C3. Public
Participation
Ongoing:
-Create
opportunities for
public, including
overburdened
communities,
and speciï¬cally,
highly impacted
communities, to
participate in
SWMP and SMAP.
-Post SWMP and
Annual Report to
website by May
31.
By Dec 31:
Document
methods used
to identify
overburdened
communities
S5 Permit
Components
Ongoing
Program
Implementation
2024
2025
2026
2027
2028
2029
C4. Mapping &
Documentation
Ongoing
Maintain
mapping data
By March 31:
Submit
locations of all
known outfalls
according to
standardized
template in
annual report.
By Dec 31:
Use available,
existing data to
map tree
canopy to
support
stormwater
management on
Permittee-
owned or
operated
properties.
By March 31:
Map and assess
acreage of MS4
tributary basins
to outfalls or
discharge pts
with publicly
owned SW
Treatment or FC
BMPs/facilities.
Submit with the
Annual Report a
map(s) (.pdf)
and table (.xlsx)
with a
breakdown of
the MS4
tributary basins
(see permit for
details).
By Dec 31:
Map
overburdened
communities in
relation to
stormwater
treatment and
flow control
BMPs/facilities,
outfalls,
discharge
points, and tree
canopy on
Permittee-
owned/operated
properties.
S5 Permit
Components
Ongoing
Program
Implementation
2024
2025
2026
2027
2028
2029
C5. IDDE
Ongoing
– Implement
program to
prohibit, address,
and eliminate
illicit discharges.
– Train staff
– Field screen on
average 12% of
the MS4 each
year.
-Track and
maintain records
through WQ
WebIDDE or
submit .xml
following the App
12 schema.
By Dec 31:
Coordinate with
ï¬reï¬ghting
agencies to be
notiï¬ed when
PFAS-containing
AFFFs are used
during
emergency
ï¬reï¬ghting
activities.
By Jan 1:
Update and
implement
procedures to
minimize
discharges to
MS4 during
ï¬reï¬ghting post-
emergency
cleanup and
disposal
activities.
By July 1:
Update
ordinance or
other regulatory
mechanism in
effect, if
necessary, to
meet the
requirements of
this section.
C6. Controlling
Runoff
Ongoing:
– Implement &
enforce program
to reduce
pollutants in
runoff.
– Train Staff
By June 30:
Adopt and make
effective local
program that
meets
requirements of
S5.C.6.b.i-iv.
S5 Permit
Components
Ongoing
Program
Implementation
2024
2025
2026
2027
2028
2029
C7. Stormwater
Management
for Existing
Development
(SMED)
March 31:
Provide list of
planned,
individual
projects
scheduled for
funding or
implementation
during this permit
term for the
purposes of
meeting the
assigned
equivalent
acreage in
Appendix 12
using the using
the report format
in Appendix 12.
By March 31:
Submit
documentation/
report showing
that the
jurisdiction has
fully funded,
started
construction or
completely
implemented
project(s) that
meet assigned
equivalent
acreage as
described in
App 12.
Report the
amount of
estimated or
projected
equivalent acres
managed by
facility retroï¬ts
which will be
credited to the
next permit term
(2029-2034)
S5 Permit
Components
Ongoing
Program
Implementation
2024
2025
2026
2027
2028
2029
C8. Source
Control for
Existing
Development
Ongoing:
– Implement &
enforce program
to reduce
pollutants in
runoff from
existing
development.
-Update
inventory at least
once per 5 years.
-Annually inspect
20% of inventory
list.
– Train Staff
Aug 1:
Update and
make effective
the ordinance or
other
enforceable
document, if
necessary, to
meet the
requirements of
this section.
S5 Permit
Components
Ongoing
Program
Implementation
2024
2025
2026
2027
2028
2029
C9. Operations
& Maintenance
Ongoing:
-Inspect and
maintain
Permittee
owned/operated
catch basins and
stormwater
BMPs/facilities,
and regulated
stormwater
BMPs/facilities.
-Maintain
updated SWPPP
at heavy
equipment,
maintenance,
and storage
facilities.
-Train Staff
Dec 31:
All catch basins
and inlets
owned or
operated by the
Permittee shall
be inspected,
and every two
years thereafter.
By June 30:
Adopt updates
to maintenance
standards, as
needed, to meet
the
requirements of
this section.
July 1:
Develop and
implement
street sweeping
program.
Between July –
Dec:
Sweep high
priority areas
once
By Dec 31:
Update
documentation
of practices,
policies, and
procedures to
reduce SW
impacts from all
permittee lands
By March 31
(ongoing from
this year
forward):
Report on all
items described
in S5.C.9.e.v(a-
f).
Between July-
Sept (ongoing
from this year
forward):
Sweep high
priority areas
once
Annually
(ongoing from
this year
forward):
Sweep high
priority areas 2
additional times
to the July-Sept
event at timing
determine by
Permittee.
S8 Permit
Components
Ongoing
Program
Implementation
2024
2025
2026
2027
2028
2029
S8.A & S8.B
By Aug 15, 2025-
2029:
Make annual
payments into
SAM per S8.D
instructions
By Dec 1: All
Permittees who
chose S8.A.2
and/or S8.B.2
option for the
2019-2024
permit make a
one-time
payment to
SAM fund per
S8.D.
All Permittees,
except
Aberdeen and
Centralia, shall
notify Ecology
in writing,
certiï¬ed with a
G19 signature,
if they will
select S8.A.2.a
or S8.A.2.a for
Regional Status
and Trends
Monitoring, as
well as their
choice of
S8.B.2.a or
S8.B.2.b for
SWMP
Effectiveness
and Source ID
Studies.
S8 Permit
Components
Ongoing
Program
Implementation
2024
2025
2026
2027
2028
2029
S8.C –
Stormwater
Discharge
Monitoring
(applies only to
Permittees who
choose to
conduct
discharge
monitoring per
S8.A.2.b and/or
S8.B.2.b.
By June 30:
Submit a draft
stormwater
discharge
monitoring
QAPP for review
and approval.
By August 15:
Final QAPP
submitted to
Ecology, or
within 60 days of
receiving
Ecology's
comments on
the draft
(whichever is
later).
By Oct 1:
Flow monitoring
shall begin, or
within 30 days of
receiving
Ecology’s ï¬nal
QAPP approval
(whichever is
later).
By Oct 1:
Stormwater
discharge
monitoring fully
implemented.
Municipal Street Sweeping Manual Chapter 8 Funding Calculator
Summary: calculator street sweeping, chapter 8 cost calculator
calculator street sweeping, chapter 8 cost calculator
Discharge/ Sample Update Form
SWPPP Template-2025
Lake Stevens SMED template for 2024 Permit
Summary: SMED, Stormwater Management for Existing Development, reporting spreadsheet, annual report, SMED projects, SMED template, Permit condition S5.C.7.b
SMED, Stormwater Management for Existing Development, reporting spreadsheet, annual report, SMED projects, SMED template, Permit condition S5.C.7.b
2024 – 2029 EW Phase II Training Plan Template
Summary: EW Phase II Permit training plan for stormwater management, 2024 permit training plan for EW Phase II
EW Phase II Permit training plan for stormwater management, 2024 permit training plan for EW Phase II
2024 – 2029 Permit Implementation Tool Bellingham
Summary: City of Bellingham compliance tracking tool, Phase II compliance deadline tracking tool.
City of Bellingham compliance tracking tool, Phase II compliance deadline tracking tool.
