Skip to content

Source Control Inspection Online Training

Summary: Source Control Inspection Online Training, Developing an inspection program training, training to conduct source control inspections, identify potential issues with source control programs.

Summary:
Source Control Inspection Online Training, Developing an inspection program training, training to conduct source control inspections, identify potential issues with source control programs.

Food Truck and Mobile Vendor Online Course Enrollment Page

Summary: Food Truck Training, Vendor Training, mobile business training, mobile business BMPs, certificate for mobile business training

Summary:
Food Truck Training, Vendor Training, mobile business training, mobile business BMPs, certificate for mobile business training

Low Impact Development Training – Advanced Topics for Long-term LID Operations: Bioretention

Summary: Long-term LID Operations, Bioretention structure and function, inspection activities, track and guide long term maintenance, LID plants, O&M costs, LID administrative tools,

INSTRUCTORS
KATE FORESTER
Landscape Architect
Key project experience:
Stormwater design,
maintenance, manual and
code development
REBECCA DUGOPOLSKI, PE
Senior Engineer
Key project experience: Stormwater
monitoring, design, and NPDES
Permit compliance
OVERVIEW OF PROGRAM
• 2012: Public and private
partners engage state
legislature to fund program
• June 2012: LID Training
Steering Committee
• 2012‐2013: Washington State
Low Impact Development
Training Plan developed:
www.wastormwatercenter.org/
lid‐background/
• Training program built from
state LID Training Plan
PROGRAM OVERVIEW
• 49 trainings in western and
eastern WA in 2014‐2015.
• 42 trainings in western and
eastern WA in 2015‐2016.
• 39 trainings offered in
western and eastern WA in
2017.
• Three levels: Introductory,
Intermediate, and Advanced.
• Statewide LID Certificate now
available.
PROJECT LEAD
ADDITIONAL TRAINING SUPPORT
OVERVIEW OF PROGRAM
CORE TEAM
Introduction to LID
for Inspection &
Maintenance Staff
INTRODUCTORY
INTERMEDIATE
ADVANCED
Intermediate LID
Design: Rainwater
Collection Systems &
Vegetated Roofs
Intermediate LID
Topics: NPDES Phase
I & II Requirements
Intermediate
LID Design:
Permeable Pavement
Intermediate
LID Design:
Hydrologic Modeling
Advanced Topics in
LID Design:
Bioretention
Advanced Topics in
LID Design:
Permeable Pavement
Advanced Topics in
LID Design:
Hydrologic Modeling
Advanced Topics in
LID Design: Site
Assessment,
Planning & Layout
Advanced Topics in
LID Design: Rainwater
Collection Systems &
Vegetated Roofs
Advanced Topics in LID
Design: Bioretention
Media and Compost
Amended Soils
OVERVIEW OF PROGRAM
Advanced Topics for
Long‐term LID
Operations:
Bioretention
Intermediate
LID Design:
Bioretention
Advanced Topics for
Long‐term LID
Operations:
Permeable Pavement
Intermediate LID
Design: Site
Assessment, Planning
& Layout
Introduction to LID
for Inspection &
Maintenance Staff
INTRODUCTORY
INTERMEDIATE
ADVANCED
Intermediate LID
Design: Rainwater
Collection Systems &
Vegetated Roofs
Intermediate LID
Topics: NPDES Phase
I & II Requirements
Intermediate
LID Design:
Permeable Pavement
Intermediate
LID Design:
Hydrologic Modeling
Advanced Topics in
LID Design:
Bioretention
Advanced Topics in
LID Design:
Permeable Pavement
Advanced Topics in
LID Design:
Hydrologic Modeling
Advanced Topics in
LID Design: Site
Assessment,
Planning & Layout
Advanced Topics in
LID Design: Rainwater
Collection Systems &
Vegetated Roofs
Advanced Topics in LID
Design: Bioretention
Media and Compost
Amended Soils
OVERVIEW OF PROGRAM
Advanced Topics for
Long‐term LID
Operations:
Bioretention
Intermediate
LID Design:
Bioretention
Advanced Topics for
Long‐term LID
Operations:
Permeable Pavement
Intermediate LID
Design: Site
Assessment, Planning
& Layout
Training Program
Statewide LID
ADVANCED TOPICS FOR LONG-TERM
LID OPERATIONS: BIORETENTION
LEARNING OBJECTIVES
Gain an understanding of the structure and function of
bioretention components
Develop an in‐depth understanding of inspection
activities to track and guide long‐term facility
maintenance
Know the requirements for primary preventative and
intensive maintenance of bioretention facilities
Understand how to adaptively manage bioretention
facilities by tracking trends in facility conditions and
outcomes of maintenance activities
LOGISTICS
SCHEDULE
• 8‐hour training
• Lunch is provided
• Site visits/field exercises in the
afternoon
OTHER LOGISTICS
• Restrooms
• Turn off cell phones
• Sign in and sign out
introduction
AGENDA
bioretention O&M
plants
O&M costs
wrap up
administrative tools
23456
introduction
123456
TOPICS
INTRODUCTION
Intro to LID
NPDES Permit
LID O&M Overview
LOW IMPACT DEVELOPMENT (LID):
Stormwater Management Strategy
INTRODUCTION
• Site design & planning
techniques emphasizing
conservation
• Use of small‐scale engineered
controls to closely mimic pre‐
development hydrologic
processes
LID: Principles
pre‐developed forest vs. developed condition
INTRODUCTION
2012 LID Technical Guidance Manual for Puget Sound
LID: Small‐Scale Engineering Controls
INTRODUCTION
• Infiltration
• Filtration
• Storage
• Evaporation
• Transpiration
Synonyms for LID BMPs:
Green Stormwater Infrastructure (GSI), Integrated Management Practices (IMPs), and On-Site Stormwater
Management BMPs
Replace Pre‐developed
Hydrologic Functions
TOPICS
INTRODUCTION
Intro to LID
NPDES Permit
LID O&M Overview
NPDES PERMIT REQUIREMENTS
INTRODUCTION
National Pollutant Discharge Elimination System (NPDES) Municipal Stormwater
Permits
Municipal Stormwater Permittees in Washington State
Phase I Permittees
Western Washington Phase
II Permittees
Eastern Washington Phase II
Permittees
Seattle
Tacoma
Clark County
King County
Pierce County
Snohomish County
82 Cities
5 Counties
18 Cities
5 Counties
Secondary Permittees: Approximately 45; such as ports and universities
To see a listing of permittees visit
http://www.ecy.wa.gov/programs/wq/stormwater/municipal/MuniStrmWtrPermList.html
NPDES PERMIT REQUIREMENTS:
Requirements Vary By Permittee
INTRODUCTION
• Phase II requirements are somewhat less extensive
• Secondary permittee requirements vary
Timeline for updating maintenance standards
Phase I
Per Section S5.C.9.a of
the Phase I Permit
Phase II
June
2014
June 30,
2015
Dec. 31,
2016
June 30,
2017
June 30,
2018
Most
Permits
Lewis Co. and
Cowlitz Co.
City of
Aberdeen
Per Section S5.C.5.a of the Phase I Permit
NPDES PERMIT REQUIREMENTS:
Requirements Vary By BMP Classification
INTRODUCTION
• On‐site Stormwater
Management BMPs
• Stormwater Treatment
and Flow Control
BMPs/Facilities
NPDES PERMIT REQUIREMENTS: Minimum
Requirements (MRs)
INTRODUCTION
Preparation of Stormwater
Site Plans
Construction SWPPP
Source Control
Preserve natural Drainage
On‐Site Stormwater
management
Run‐off Treatment
Flow Control
Wetlands Protection
O&M
NPDES PERMIT REQUIREMENTS: Minimum
Requirements (MRs)
INTRODUCTION
Curtis Hinman
Lotus Springs
• MR #2 – Construction Stormwater
Pollution Prevention Plan (SWPPP)
• Protect LID BMPs from sediment and
compaction
• MR #5 – On‐site Stormwater
Management
• Infiltrate, disperse, and retain runoff
on‐site to the extent feasible
NPDES PERMIT REQUIREMENTS: Minimum
Requirements (MRs)
INTRODUCTION
• MR #6 – Runoff Treatment
• Water quality treatment for
pollution‐generating areas
• MR #7 – Flow Control
• Control of flow peaks and flow
durations
• MR #9 – O&M
• Require an O&M manual for
proposed stormwater facilities
and BMPs
NPDES PERMIT REQUIREMENTS: On‐site
Stormwater Management BMPs
INTRODUCTION
• Used to help meet MR #5
• May be used to help meet MR #6
and/or MR #7
• “On‐site Stormwater Management
BMPs”= LID BMPs
NPDES PERMIT REQUIREMENTS: On‐site
Stormwater Management BMPs
INTRODUCTION
• Includes the following LID BMPs:
Rain Gardens (BMP T5.14A)
Bioretention (BMP T5.14B)
Permeable Pavement (BMP T5.15)
Vegetated Roofs (BMP T5.17)
Downspout Full Infiltration (BMP T5.10A)
Downspout Dispersion (BMP T5.10B)
Concentrated Flow Dispersion (BMP T5.11)
Sheet Flow Dispersion (BMP T5.12)
Compost‐amended soils (BMP T5.13)
SR 231 – Aimee S. Navickis-Brasch
NPDES PERMIT REQUIREMENTS: Treatment
and Flow Control BMPs/Facilities
LID O&M OVERVIEW
• Subset of On‐site Stormwater Management BMPs
• Used to meet MR #6 or MR #7
• May also be used to meet MR #5
• Includes the following BMPs:
Bioretention (BMP T5.14B)
Permeable Pavement (BMP T5.15)
Vegetated Roofs (BMP T5.17)
Detention facilities
Standard infiltration facilities
Treatment BMPs/facilities
TOPICS
INTRODUCTION
Intro to LID
NPDES Permit
LID O&M Overview
NPDES PERMIT LID O&M REQUIREMENTS:
O&M Standards
INTRODUCTION
Requirement
On‐site SW
Management
BMPs
SW Treatment & Flow
Control BMPs/Facilities (MR
#6 and/or MR #7)
Implement maintenance standards
Adopt or update ordinance or other
enforceable documents
Implement practices, policies, &
procedures to reduce stormwater
impacts associated with runoff
NPDES PERMIT LID O&M REQUIREMENTS:
Plan Review
INTRODUCTION
Requirement
On‐site SW
Management
BMPs
SW Treatment & Flow
Control BMPs/Facilities (MR
#6 and/or MR #7)
Verify maintenance plan completed &
O&M responsibility assigned
Verify submission of maintenance
instructions
Verify that O&M manual is complete
Review and approve declaration of
covenant (including design details,
figures and maintenance instructions)
and grant of easement
NPDES PERMIT LID O&M REQUIREMENTS:
Inspection
INTRODUCTION
Requirement
On‐site SW
Management
BMPs
SW Treatment & Flow
Control BMPs/Facilities (MR
#6 and/or MR #7)
Legal authority to inspect private
stormwater facilities and enforce
maintenance standards
Conduct post‐construction
inspections to ensure proper
installation
NPDES PERMIT LID O&M REQUIREMENTS:
Inspection (continued)
INTRODUCTION
Requirement
On‐site SW
Management
BMPs
SW Treatment & Flow
Control BMPs/Facilities (MR
#6 and/or MR #7)
Conduct inspections during
construction in new residential
developments*
Conduct ongoing annual inspections
Perform spot checks for potentially
damaged BMPs owned/operated by
Permittee after major storm events
*Every 6 months until 90% of the lots are constructed or when construction is
stopped and the site is fully stabilized
NPDES PERMIT LID O&M REQUIREMENTS:
Enforcement
INTRODUCTION
Requirement
On‐site SW
Management
BMPs
SW Treatment & Flow
Control BMPs/Facilities (MR
#6 and/or MR #7)
Enforce compliance with
maintenance standards, as needed,
based on inspection
NPDES PERMIT LID O&M REQUIREMENTS:
Training
INTRODUCTION
Requirement
On‐site SW
Management
BMPs
SW Treatment & Flow
Control BMPs/Facilities (MR
#6 and/or MR #7)
Train staff involved in plan review,
permitting, construction site
inspections, & enforcement
Implement an ongoing training
program for employees who have
primary O&M job functions that may
impact SW quality
NPDES PERMIT LID O&M REQUIREMENTS:
Record Keeping
INTRODUCTION
Requirement
On‐site SW
Management
BMPs
SW Treatment & Flow
Control BMPs/Facilities (MR
#6 and/or MR #7)
Keep records of inspections and
enforcement actions (e.g., inspection
reports, notices of violations)
NPDES PERMIT LID O&M REQUIREMENTS:
Mapping
INTRODUCTION
Requirement
On‐site SW
Management
BMPs
SW Treatment & Flow
Control BMPs/Facilities
(MR #6 and/or MR #7)
Scale drawing of the lot(s) and
public ROW that show BMP
locations
Map BMPs owned/operated by
Permittee
Map connections between BMPs
and tributary conveyances*
*Phase I Only
LID O&M GUIDANCE DOCUMENT: Objectives
INTRODUCTION
• Support permittees in implementing
LID maintenance programs
• Provide specific O&M guidance so
permittees can create maintenance
standards that preserve facility
function
• Note: Jurisdictions may want to tailor
the tables in the O&M guidance
document to address varying levels‐
of‐service
Drena Donofrio
LID O&M GUIDANCE DOCUMENT:
Development
INTRODUCTION
• Two advisory committees
• LID Maintenance Advisory
Committee
• LID Maintenance Administrative
Issues Advisory Committee
• Best available information
• Advisory committee input
• Literature review
• Targeted surveys sent to
jurisdictions, contractors/
landscapers, and vendors
• Guidance will evolve over time
LID O&M GUIDANCE DOCUMENT: Content
INTRODUCTION
• Summary of NPDES Permit Requirements
• Maintaining LID BMPs
• Bioretention facilities
• Rain gardens
• Permeable pavement
• Vegetated roofs
• Programmatic & Administrative Guidance
• Downspout infiltration systems
• Downspout, sheet flow, and conc. dispersion
systems
• Compost amended soils
SPU
LID O&M GUIDANCE DOCUMENT: Content
INTRODUCTION
• BMP description
• How water moves through facility
• Key maintenance considerations to
ensure facility function
• Function by BMP component
• Key maintenance by BMP
component
• Key operations to preserve facility
function
Drena Donofrio
LID O&M GUIDANCE DOCUMENT:
Maintenance Standard and Procedures
INTRODUCTION
LID O&M GUIDANCE DOCUMENT:
Equipment and Materials List
INTRODUCTION
LID O&M GUIDANCE DOCUMENT:
Skills and Staffing
INTRODUCTION
• List of general skills required
• List of additional specialized
skills
• Staffing survey estimates (e.g.,
crew hours per facility, per
linear foot, or per square foot)
bioretention O&M
23456
• Definition and Types
• Components
• How the facility works
• Bioretention vs. rain gardens
• Maintenance standards & procedures
by component
• Equipment and materials
• Skills
OVERVIEW
BIORETENTION O&M
SPU
• Shallow landscaped depressions that
receive stormwater from small
contributing areas
• Small scale, dispersed facilities
• Types:
• Bioretention cells
• Bioretention swales
• Infiltration planters
• Flow‐through planters
DEFINITION AND TYPES
BIORETENTION O&M
SPU
• Flow Entrance
• Pre‐Settling
• Ponding Area
• Bioretention Soil
• Mulch/Compost
• Vegetation
• Filter Fabric (?)
• Liner (optional)
• Underdrain (optional)
• Overflow
COMPONENTS
BIORETENTION O&M
Eastern WA LID Manual
2009 Clean Water Services LIDA Handbook
HOW THE FACILITY WORKS
BIORETENTION O&M
Bioretention Cell
• Water enters facility
• Ponds
• Infiltrates through
bioretention soil/ gravel
bed
• Infiltrates into underlying
soil
• Ponded water exceeding
max. depth overflows
HOW THE FACILITY WORKS
BIORETENTION O&M
Bioretention Planter
• Water enters facility
• Ponds
• Infiltrates through
bioretention
soil/gravel bed
• Infiltrates into
underlying soil
• Ponded water
exceeding max. depth
overflows
2009 Clean Water Services LIDA Handbook
• Water enters facility
• Ponds
• Infiltrates through
bioretention soil/ gravel
bed
• Infiltrates into
underlying soil
• Ponded water
exceeding max. depth
overflows
• Underdrain collects
water in gravel layer
and routes to overflow
HOW THE FACILITY WORKS
BIORETENTION O&M
Bioretention Planter
2009 Clean Water Services LIDA Handbook
BIORETENTION VS RAIN GARDENS
BIORETENTION O&M
• Bioretention:
• Often includes surface and subsurface
infrastructure
• Designed soil mix
• Meets requirements for MR #6 and #7 and
required for MR #5 if MR #1‐9 required
• Rain gardens
• Usually do not include under‐drains
• May use less restrictive soil mix guidelines
(e.g., existing soil augmented with compost
and sand)
• Meets MR #5 requirements.
• Inlets
• Ponding area
• Check dams/weirs
• Bioretention soil
• Outlets
• Underdrains
• Mulch
Maintenance Standards & Procedures By
Component
BIORETENTION O&M
Siskyou Street, Portland
INLETS: Types
BIORETENTION O&M
Sheet flow from sidewalk and
roadway
Sheet flow from parking lot
INLETS: Types
BIORETENTION O&M
Curb cut
Curb cut with grate
INLETS: Types
BIORETENTION O&M
Trench drain from roadway
Trench drain from upslope BMP
INLETS: Types
BIORETENTION O&M
Piped inlet from upslope BMP
Piped inlet from roadway/parking lot
• Stormwater must freely
enter facility (no
obstructions)
• Water entering facility
should not cause erosion
INLETS: Maintenance Considerations
BIORETENTION O&M
12th Avenue, Portland
INLETS: Maintenance
BIORETENTION O&M
• Maintain erosion control at concentrated flow inlets
(e.g., rock pad)
• Ensure pipe is not damaged or clogged
Trench drain
Piped flow
Curb cut
INLETS: Maintenance
BIORETENTION O&M
• Remove accumulated…

Source Control Inspection Program Guidance Manual Training Slides

Summary: Source Control Inspection Program Training slides, source control inspection program training objectives, permit requirements for source control program and training, SWMMWW Volume IV and source control BMPs, Source Control Inspection Guidance Manual overview, source control pre-inspection…

Source Control Inspection Program
Training
Rebecca Dugopolski, PE
Mindy Fohn
Training Overview
• Training logistics and objectives
• Introductions and project overview
• Permit requirements overview
• Source control BMP overview
• Guidance manual overview
• Focus on Inspections
• Focus on Education and Outreach Materials
• Focus on Implementation
• Wrap up and evaluation
Training Overview
• Training logistics and objectives
• Introductions and project overview
• Permit requirements overview
• Source control BMP overview
• Guidance manual overview
• Focus on Inspections
• Focus on Education and Outreach Materials
• Focus on Implementation
• Wrap up and evaluation
Training Logistics
• Full day training (9:00am to 3:30pm)
• Lunch (on your own, ~45 minutes)
• Restroom location
• Turn off cell phones
• Sign‐in sheet
• Training evaluation
Training Objectives
• Discuss key topics included in the NPDES Phase II permit (S5.C.8.b.v)
• Provide an overview of the Source Control (Business/Site) Inspection
Program Guidance Manual
• Highlight critical items related to developing a business/site inspection
program and conducting business/site inspections
• Provide peer‐to‐peer learning opportunities
• Practice using inspection forms, asking questions, and identifying
potential business/site issues
Training Overview
• Training logistics and objectives
• Introductions and project overview
• Permit requirements overview
• Source control BMP overview
• Guidance manual overview
• Focus on Inspections
• Focus on Education and Outreach Materials
• Focus on Implementation
• Wrap up and evaluation
Acknowledgements
• Stormwater Action Monitoring (project funding)
• Washington Stormwater Center (project lead)
• Department of Ecology
• Technical Advisory Committee (TAC)
• Business Inspection Group (BIG)
• Pollution Prevention Assistance (PPA)
Rebecca Dugopolski, PE
Associate Engineer
Introductions: Instructors
Mindy Fohn
Scientist
Introductions: Participants
• What is your name?
• Who do you work for?
• What is your job role?
Project Overview
Information Search
• 4 interviews
(summary
report)
• BIG report
information gap
summary (tech
memo)
• Online resource
directory
Online Guidance
Manual
• 3 priority
sections
(Chapters 1‐3)
• Draft Manual
• Final Manual
Business
Inspection Training
• Training
outline/agenda
• Training
curriculum
• In‐person
trainings
• Online training
module
• Training video
Project Schedule
• All education & outreach
and training materials will
be posted with the online
manual (Chapters 7 & 8)
by December 30, 2022
Training Overview
• Training logistics and objectives
• Introductions and project overview
• Permit requirements overview
• Source control BMP overview
• Guidance manual overview
• Focus on Inspections
• Focus on Education and Outreach Materials
• Focus on Implementation
• Wrap up and evaluation
Permit Requirements Overview
NPDES Phase II
Permit Section
Category
Timeline
S5.C.8.b.i.
Source Control Code/Ordinances
August 1, 2022
S5.C.8.b.ii
Source Control Inventory
August 1, 2022
S5.C.8.b.iii
Inspection Program
January 1, 2023
Business Education and Outreach
Materials
At one time or spread over
permit term
S5.C.8.b.iv
Enforcement Policy
January 1, 2023
S5.C.8.b.v
Training
Ongoing
Focus of today’s training
Permit Requirements Overview
S5.C.8.b.iii Inspection Program
• 20% of businesses/sites in Inventory
• Permittee selects sites (100% inspection is
NOT required for 5‐year permit term)
• Businesses/sites can be prioritized
• Must inspect 100% of credible complaints
• Count follow‐up inspections
• Count inspections that are denied entry
All credible
complaints
Follow‐up inspections
Inspector denied
entry
20%
Priority site/business
inspections
Source Control Inventory
20%
Annual
Inspection
Requirement
Permit Requirements Overview
S5.C.8.b.iii Education and Outreach Materials
• Educate about activities that generate pollutants
and applicable source control requirements
• Mail, telephone, electronic, in person
• At one time or spread over permit term
(i.e., during site inspections)
Training Overview
• Training logistics and objectives
• Introductions and project overview
• Permit requirements overview
• Source control BMP overview
• Guidance manual overview
• Focus on Inspections
• Focus on Education and Outreach Materials
• Focus on Implementation
• Wrap up and evaluation
Source Control BMP Overview
What is a source control BMP?
A structure or operation intended to prevent pollutants
from coming into contact with stormwater through
physical separation of areas or careful management of
activities that are sources of pollutants.
Key Definitions
Photo Credit: Ryean‐Marie
Tuomisto, City of Kirkland
Source Control BMP Overview
What is a source control BMP?
• Structural Source Control BMPs are physical, structural,
or mechanical devices or facilities that are intended to
prevent pollutants from entering stormwater.
• Operational Source Control BMPs are non‐structural
practices that prevent or reduce pollutants from
entering stormwater.
Key Definitions
Source Control BMP Overview
• SWMMWW Volume IV
• Grouped by category
Applicable to All
Sites
(IV‐1)
Cleaning or
Washing
(IV‐2)
Roads, Ditches,
and Parking Lots
(IV‐3)
Soil Erosion,
Sediment Control,
and Landscaping
(IV‐4)
Storage and
Stockpiling
(IV‐5)
Transfer of Liquid
or Solid Materials
(IV‐6)
Other
(IV‐7)
Source Control BMP Overview
Applicable to All
Sites (IV‐1)
Correcting Illicit
Discharges to Storm
Drains
(S410 BMPs)
Formation of a Pollution
Prevention Team
(S453 BMPs)
Preventive Maintenance/
Good Housekeeping
(S454 BMPs)
Spill Prevention and
Cleanup
(S455 BMPs)
Employee Training
(S456 BMPs)
Inspections
(S457 BMPs)
Record Keeping
(S458 BMPs)
Source Control BMP Overview
• Contain and clean up leaks and spills
• Collect water from pressure washing
• Do not hose down pollutants
• Sweep quarterly (or more frequently)
• Use drip pans to collect spills and leaks
• Clean stormwater facilities regularly
(and many more)
Applicable to All
Sites (IV‐1)
Photo Credit: Ryean‐Marie Tuomisto, City of Kirkland
Preventive Maintenance/
Good Housekeeping
(S454 BMPs)
Source Control BMP Overview
• Spill prevention
• Spill plan
• Spill cleanup kits
• Spill cleanup and proper
disposal of waste
Applicable to All
Sites (IV‐1)
Photo Credit: Sophorn Sim
Spill Prevention and
Cleanup
(S455 BMPs)
Source Control BMP Overview
Cleaning or Washing
(IV‐2)
Washing and Steam
Cleaning Vehicles /
Equipment / Building
Structures
(S431 BMPs)
Potable Water Line
Flushing, Water Tank
Maintenance, and Hydrant
Testing
(S441 BMPs)
Dock Washing
(S434 BMPs)
Photo Credit: Ryean‐Marie Tuomisto, City of Kirkland
Source Control BMP Overview
Roads, Ditches, and
Parking Lots
(IV‐3)
Deicing and Anti‐Icing
Operations for Airports
(S405 BMPs)
Streets and Highways
(S406 BMPs)
Maintenance of Public
and Private Utility
Corridors and Facilities
(S415 BMPs)
Maintenance of
Roadside Ditches
(S416 BMPs)
Maintenance of
Stormwater Drainage
and Treatment Systems
(S417 BMPs)
Parking and Storage of
Vehicles and Equipment
(S421 BMPs)
Urban Streets
(S430 BMPs)
Source Control BMP Overview
Soil Erosion,
Sediment Control,
and Landscaping
(IV‐4)
Dust Control at
Disturbed Land Areas
and Unpaved Roadways
and Parking Lots
(S407 BMPs)
Dust Control at
Manufacturing Areas
(S408 BMPs)
Landscaping and Lawn/
Vegetation Management
(S411 BMPs)
Soil Erosion and
Sediment Control at
Industrial Sites
(S425 BMPs)
Pesticides and an
Integrated Pest
Management Program
(S435 BMPs)
Storage of Dry Pesticides
and Fertilizers
(S444 BMPs)
Nurseries and
Greenhouses
(S449 BMPs)
Irrigation
(S450 BMPs)
Source Control BMP Overview
Storage and
Stockpiling
(IV‐5)
Storage of Liquid, Food
Waste, or Dangerous
Waste Containers
(S427 BMPs)
Storage of Liquids in
Permanent Aboveground
Tanks
(S428 BMPs)
Storage or Transfer
(Outside) of Solid Raw
Materials, Byproducts, or
Finished Products
(S429 BMPs)
Temporary Fruit Storage
(S445 BMPs)
Source Control BMP Overview
Storage and
Stockpiling
(IV‐5)
Storage or Transfer
(Outside) of Solid Raw
Materials, Byproducts, or
Finished Products
(S429 BMPs)
• Store in a covered area or
under temporary plastic
sheeting (*see table)
• Regular sweeping
• DO NOT hose down
Stockpiles of erodible or water‐
soluble materials such as:
Outside storage for solid
materials such as:
Soil
Logs
Road deicing salts
Bark
Compost
Lumber
Unwashed sand and gravel
Metal products
Sawdust
Source Control BMP Overview
Transfer of Liquid or
Solid Materials
(IV‐6)
Fueling At Dedicated
Stations
(S409 BMPs)
Loading and Unloading
Areas for Liquid or
Solid Material
(S412 BMPs)
Mobile Fueling of
Vehicles and Heavy
Equipment
(S419 BMPs)
Spills of Oil and
Hazardous Substances
(S426 BMPs)
In‐Water and Over‐
Water Fueling
(S439 BMPs)
Source Control BMP Overview
Transfer of Liquid or
Solid Materials
(IV‐6)
Fueling At Dedicated
Stations
(S409 BMPs)
• Posted spill plan
• Suitable cleanup materials (such as dry
adsorbent)
• Post signs in accordance with the Fire
Code (such as “No topping off”)
• Newer and substantially remodeled
fueling stations should be covered and
drain to an oil‐water separator or
equivalent
Source Control BMP Overview
Other Source
Control BMPs
(IV‐7)
Building, Repair, and
Maintenance of Boats
and Ships
(S401 BMPs)
Commercial Animal
Handling Areas
(S402 BMPs)
Commercial Composting
(S403 BMPs)
Commercial Printing
Operations
(S404 BMPs)
Log Sorting and Handling
(S413 BMPs)
Maintenance and Repair
of Vehicles and
Equipment
(S414 BMPs)
Manufacturing Activities
– Outside
(S418 BMPs)
Painting/Finishing/
Coating of
Vehicles/Boats/
Buildings/Equipment
(S420 BMPs)
Railroad Yards
(S422 BMPs)
Recyclers and Scrap
Yards
(S423 BMPs)
Roof/Building Drains at
Manufacturing and
Commercial Buildings
(S424 BMPs)
Source Control BMP Overview
Other Source
Control BMPs
(IV‐7)
Wood Treatment Areas
(S432 BMPs)
Pools, Spas, Hot Tubs,
and Fountains
(S433 BMPs)
Color Events
(S436 BMPs)
Construction Demolition
(S438 BMPs)
Pet Waste
(S440 BMPs)
Labeling Storm Drain
Inlets on Your Property
(S442 BMPs)
Fertilizer Application
(S443 BMPs)
Well, Utility, Directional,
and Geotechnical Drilling
(S446 BMPs)
Roof Vents
(S447 BMPs)
Building, Repair,
Remodeling, Painting,
and Construction
(S451 BMPs)
Goose Waste
(S452 BMPs)
Source Control BMP Overview
Landscaping and Lawn/
Vegetation Management
(S411 BMPs)
Pesticides and an
Integrated Pest
Management Program
(S435 BMPs)
Storage of Dry Pesticides
and Fertilizers
(S444 BMPs)
Irrigation
(S450 BMPs)
Soil Erosion,
Sediment Control,
and Landscaping
(IV‐4)
Fertilizer Application
(S443 BMPs)
Other Source
Control BMPs
(IV‐7)
Training Overview
• Training logistics and objectives
• Introductions and project overview
• Permit requirements overview
• Source control BMP overview
• Guidance manual overview
• Focus on Inspections
• Focus on Education and Outreach Materials
• Focus on Implementation
• Wrap up and evaluation
Guidance Manual Overview
• Hosted by the Washington Stormwater Center
• Hybrid format: web navigation + downloadable PDF chapters
• Source Control Online Resource Library (SCORL) provides
supplemental resources (links, materials) grouped by chapter
www.wastormwatercenter.org/permit‐assistance/municipal/source‐
control‐inspection‐program‐guidance‐manual
Guidance Manual Overview
Originally posted in Dec.
2021 (minor updates to
add hyperlinks, clarify
permit dates, and update
the Chapter 6 title
posted in April 2022)
Guidance Manual Overview
Example inspection form
(Survey123) posted in July
2022; Word version
developed in Sept. 2022
Additional spill plan
resources posted in July
2022
Guidance Manual Overview
• Chapter 1: Background and
Regulatory Requirements
• Chapter 2: Developing Source
Control Code/Ordinances and
Enforcement Policies
• Chapter 3: Source Control
Inventory Development, Updates,
and Prioritization
Chapter 2 Overview
Source Control
Online Resource
Library (SCORL)
Developed for this project
From original BIG Report and
supplemental research
Chapter 3 Overview
Source Control
Online Resource
Library (SCORL)
From original
BIG Report
From project
research
Developed for this project
Guidance Manual Overview
• Chapter 4: Developing a Business/Site Inspection Program
• Chapter 5: Conducting Business/Site Inspections
• Chapter 6: Data Management and Recordkeeping
• Chapter 7: Education and Outreach Materials
• Chapter 8: Training
Chapter 4 Overview
Developed for this project
From original
BIG Report
and
supplemental
research
Chapter 5 Overview
Developed for this project
From original
BIG Report
From project
research
Chapter 6 Overview
Demonstrations and supporting
documentation (formerly saved
elsewhere on the Washington
Stormwater Center website)
Chapter 7 Overview
From original
BIG Report and
supplemental
research
Source Control Online
Resource Library (SCORL)
From original
BIG Report and
supplemental
research
Chapter 7 Overview
Chapter 8 Overview
Developed for this project
Training Overview
• Training logistics and objectives
• Introductions and project overview
• Permit requirements overview
• Source control BMP overview
• Guidance manual overview
• Focus on Inspections
• Focus on Education and Outreach Materials
• Focus on Implementation
• Wrap up and evaluation
Focus on Inspections
Pre‐inspection activities
Business/site inspection
Follow‐up (post‐inspection) activities
Pre-inspection Activities
• Program development activities
• Business/site research
• Pre‐inspection logistics
• Materials and equipment preparation
Topics
Pre-inspection Activities
Establish contacts within your organization
Code enforcement
IDDE
O&M
Consider developing SOPs
Roles/responsibilities
Training & safety
Inspection form
Inspection process
Data management
Progressive enforcement
(+ more)
Program
Development
Pre-inspection Activities
Will you coordinate with other programs?
• External: PPA, Ecology
• Internal: IDDE response, SW facility inspections, FOG, IWPT
• What do you see as advantages or disadvantages of joint inspections?
Program
Development
Pre-inspection Activities
Inspection forms – Electronic vs. paper
Advantages
• Centralized database
• Standardize data entry with
drop‐downs
• Dynamic inventory updates
• Reference materials
• Tracking tools
Disadvantages
• Social interaction
• Equipment required: field
tablet, charger, etc.
Program
Development
Pre-inspection Activities
Inspection Form Content
• Site/business ID & tracking
• Confirm inventory details/activities
• Inspector name(s)
• Type of inspection: Initial, Routine, Follow‐up, Complaint
• Source control BMPs: S, A, N/A
• Group by area or activity
• Placeholders for photos
• Summary of action items
Program
Development
Pre-inspection Activities
• What’s your approach to who gets
inspected when?
• Geographical
• Business sector
• Priority catchments/ receiving waters
• Will you notify them first?
Logistics
Pre-inspection Activities
• Verify name, address, contact, hours of operation (if available)
• Business owner vs. manager
• What is the business type and activities?
• What are the potential pollutant…

Chapter 8 Source Control Training Agenda

Summary: Agenda template for source control training, guidance manual training source control, source control inspection forms, how to use inspection forms for source control

Page 1 of 2
TRAINING AGENDA
Source Control Inspection Training
Dates
10/6/22, 10/11/22, 10/19/22, and 10/25/22
Time
9:00 a.m. – 3:30 p.m.
Locations
Bremerton, Centralia, Skagit Co., and Federal Way
Objectives
Discuss key topics included in the National Pollutant Discharge Elimination System
(NPDES) Phase II permit (S5.C.8.b.v)
Provide an overview of the Source Control (Business/Site) Inspection Program
Guidance Manual
Highlight critical items related to developing a business/site inspection program and
conducting business/site inspections
Provide peer-to-peer learning opportunities
Practice using inspection forms, asking questions, and identifying potential
business/site issues
Target
Audiences
Municipal source control inspectors
Municipal stormwater program managers
Consultants hired by a jurisdiction to support source control inspections
Agenda
Time (approx.)
Length
Topic
9:00-9:05am
5 min
Training logistics and objectives
9:05-9:20am
15 min
Introductions and project overview
9:20-9:30am
10 min
NPDES permit requirements overview
9:30-9:45am
15 min
Source control best management practice (BMP) overview
9:45-10:15am
30 min
Source Control Inspection Program Guidance Manual overview
Focus on Inspections
10:15-10:45am
30 min
Pre-inspection activities
10:45-11:05am
20 min
Small group discussion: Data management and field data collection
11:05-11:15am
10 min
Break
11:15-11:45am
30 min
Business/site inspection and documentation
Page 2 of 2
Time (approx.)
Length
Topic
Focus on Inspections (continued)
11:45am-12:15pm
30 min
Group activity 1: In-class exercise related to identifying common issues for
specific business sectors
12:15-1:00pm
45 min
Lunch (on your own)
1:00-1:30pm
30 min
Follow-up (post-inspection) activities
Focus on Education and Outreach Materials
1:30-1:50pm
20 min
Education and outreach resources overview
Focus on Implementation
1:50-2:20pm
30 min
Notes from the field: Case studies and lessons learned
2:20-3:20pm
60 min
Group activity 2: Mock inspection
3:20-3:30pm
10 min
Wrap-up and training evaluation

Source Control Inspection Program Training October 2022

Summary: Source Control Inspection outline,critical items for developing a business inspection program and conducting inspections,

Page 1 of 4
TRAINING OUTLINE
Source Control Inspection Program Training
Date
10/6/22, 10/11/22, 10/19/22, and 10/25/22
Time
9:00 a.m. – 3:30 p.m.
Location
Bremerton, Centralia, Skagit Co., and Federal Way
Objectives
Discuss key topics included in the NPDES Phase II permit (S5.C.8.b.v)
Provide an overview of the Source Control (Business/Site) Inspection Program Guidance
Manual
Highlight critical items related to developing a business/site inspection program and
conducting business/site inspections
Provide peer-to-peer learning opportunities
Practice using inspection forms, asking questions, and identifying potential business/site
issues
Target
Audiences
Municipal source control inspectors
Municipal stormwater program managers
Consultants hired by a jurisdiction to support source control inspections
Annotated Outline
Time (approx.)
Length
Topic
9:00-9:05am
5 min
Training logistics and objectives
9:05-9:20am
15 min
Introductions and project overview
9:20-9:30am
10 min
NPDES permit requirements overview
9:30-9:45am
15 min
Source control best management practices (BMP) overview
9:45-10:15am
30 min
Source Control Inspection Program Guidance manual overview
8 chapters
Hybrid format
Supplemental resources developed for Chapters 2, 3, 4, 5, & 7
Page 2 of 4
Time (approx.)
Length
Topic
Focus on Inspections
10:15-10:45am
30 min
Pre-inspection activities
Program development
Establish contacts within your organization: code enforcement, IDDE, O&M,
etc.
Consider developing SOPs
Coordinate with other inspectors (PPA, Dept. of Health, Ecology) to arrange
joint inspections or count their inspections
Determine preferred inspection form content
Pre-inspection logistics
Determine if an appointment is needed or plan to drop-in
Determine whether site-specific safety plan is in place
Prepare inspection form
Business/site research
*Not all activities are required before conducting an inspection
Check to see if business business/site contact is available: check business
website, identify property manager for shared dumpsters/facilities
Research business type and potential pollutant generating sources
Determine if the site has an existing stormwater or water quality permit
Review records from previous inspections
Research the water quality complaint history and IDDE records
Review the onsite drainage as-builts
Review information about potential source control BMPs related to
anticipated site activities
Materials and equipment preparation
Documents (business cards, inspection form, outreach materials, etc.)
Safety equipment (hard hat, eye protection, etc.)
Inspection equipment (manhole cover hook or lid lifter, camera, etc.)
10:45-11:05am
20 min
Small group discussion
Goal: Knowledge sharing
Instructions: Split into discussion groups based on what participants are using (or
interested in using) for data management and field data collection.
Questions:
1. What do you use for data management and field data collection?
2. What are the advantages and disadvantages of your system?
Page 3 of 4
Time (approx.)
Length
Topic
11:05-11:15am
10 min
Break
11:15-11:45am
30 min
Business/site inspection and documentation
Safety check
Appropriate PPE
Precautions, warnings, traffic
Determine whether site-specific safety plan is in place *Industrial sites
At the door
Friendly introduction
Identify the appropriate business/site contact
Explanation of inspection purpose + mutual objective (aka Elevator Speech):
technical assistance, moving toward compliance, etc.
Opportunity for relationship building and listening
Refusal of site visit: Ways to get your foot in the door vs. when to move on
Site walk-through and Documentation
Key items to look for
Document inspection: data collection, photos
Inspection close-out
Verify contact information
Share educational materials
Discuss next steps
Follow-up
Enforcement
When to contact Ecology
11:45am-
12:15pm
30 min
Group activity 1
Goal: Identify common issues and actions
Instructions: Review site maps and photos for the following example sites:
Automotive Repair Facility with Fueling
Landscaping/Nursery
Multi-Use Site: Fast Food, Fueling Station, and Car Wash
Questions:
1. What do you see?
2. What actions does the business owner need to take?
3. What actions should the inspector take?
12:15-1:00pm
45 min
Lunch (on your own
Page 4 of 4
Time (approx.)
Length
Topic
1:00-1:30pm
30 min
Follow-up (post-inspection) activities
Update business/site inspection information in data management system
Record and communicate inspection results
Set appointment reminders for follow-up inspections (if needed)
Progressive enforcement and options for support, technical assistance, etc.
Follow-up coordination with external agencies/internal staff or resources as
needed (see Pre-inspection activities: Program development)
Begin the enforcement process (if required)
Focus on Education and Outreach Materials
1:30-1:50pm
20 min
Review education and outreach resources developed as part of this project and
resources available with the online guidance manual
General information
Dumpsters
Spills
Storm drainage system maintenance
Washwater
Specific business sectors
Focus on Implementation
1:50-2:20pm
30 min
Notes from the field: Case studies and lessons learned
2:20-3:20pm
60 min
Group activity 2
Goals:
Identify common issues and actions
Test out inspection form (hard copy or electronic)
Instructions:
Walk/drive to nearby maintenance facility for mock inspection
Recap back in the training room
NOTE: This activity is a mock inspection. Areas of the site may be modified for
the training and may not represent actual conditions at the site. Identified action
items will be used for training purposes only and not for enforcement.
3:20-3:30pm
10 min
Wrap-up and training evaluation
Related trainings
Mentorship opportunities
ECOSS spill kit program
Voucher incentive programs (e.g., King County, Kitsap County)

Source Control Inspection Program Manual Chapter 8 Training

Summary: Source Control Training, Source Control Training for staff, Source Control training materials, source control training content

CHAPTER 8: TRAINING
PART OF THE SOURCE CONTROL (BUSINESS/SITE)
INSPECTION PROGRAM GUIDANCE MANUAL
Prepared for
2606 West Pioneer
Puyallup, Washington 98371
Funding Provided by
Stormwater Action Monitoring (SAM)
Prepared by
Herrera Environmental Consultants, Inc.
2200 Sixth Avenue, Suite 1100
Seattle, Washington 98121
Telephone: 206-441-9080
April 29, 2022
Table of Contents
cc_20-07522-000_scmanual_ch8_training_20220428.docx
CONTENTS
Training …………………………………………………………………………………………………………………………………………………. 1
8.1. Permit Requirements ………………………………………………………………………………………………………………….. 1
8.2. Training Content ………………………………………………………………………………………………………………………….. 1
8.3. Training Materials ……………………………………………………………………………………………………………………….. 2
Chapter 8: Training
April 2022
Source Control (Business/Site) Inspection Program Guidance Manual
8. TRAINING
This chapter summarizes the National Pollutant Discharge Elimination System (NPDES)
Municipal Stormwater permit requirements related to staff training activities. Supplemental
resources to support this chapter can be found in the Source Control Online Resource
Library (SCORL) for Chapter 8.
8.1. PERMIT REQUIREMENTS
Chapter 1: Background and Regulatory Requirements introduced the NPDES permit requirements
for training which are repeated here for context (Western Washington 2019-2024 Phase II
Permit, S5.C.8.b.v):
(v) Perrmittees shall train staff who are responsible for implementing the source
control program to conduct these activities. The ongoing training program shall
cover the legal authority for source control, source control BMPs and their
proper application, inspection protocols, lessons learned, typical cases, and
enforcement procedures. Follow-up training shall be provided as needed to
address changes in procedures, techniques, requirements, or staff. Permittees
shall document and maintain records of the training provided and the staff
trained.
8.2. TRAINING CONTENT
Several required training topics are covered in detail throughout this manual and can be
referenced when developing and/or updating inspection program training content:
Legal authority for source control (see Chapter 2: Developing Source Control
Codes/Ordinances and Enforcement Policies)
Source control BMPs and their proper application (see Chapter 5: Conducting
Business/Site Inspections)
Inspection protocols (see Chapter 4: Developing a Business/Site Inspection Program)
Enforcement procedures (see Chapter 2: Developing Source Control Codes/Ordinances
and Enforcement Policies)
Chapter 8: Training
April 2022
Source Control (Business/Site) Inspection Program Guidance Manual
8.3. TRAINING MATERIALS
Example business/site inspection program training materials that were developed for this
project include:
Training agenda
Training slides
Team exercises
Handouts/worksheets
These materials are included as SCORL Supplemental Resources 8A through 8D and can be
modified for incorporation into a jurisdiction-specific training program. Online training is also
available and can be found in the Chapter 8 SCORL Supplemental Resources.

Farmers Market Pollution Prevention Enrollment Page on Thinkific

Summary: Farmers Market pollution prevention training, BMPs for farmer’s markets, certificate for farmer’s market BMP training class,

Summary:
Farmers Market pollution prevention training, BMPs for farmer’s markets, certificate for farmer’s market BMP training class,