In this video, we welcome Stacy Paterson, senior consultant from Parametrix, as she presents a real-world case study about a facility navigating a third-party Clean Water Act lawsuit under Washington’s Industrial Stormwater General Permit (ISGP).-Stacy walks through how her team assessed compliance, uncovered critical gaps in documentation and BMP implementation, and helped the facility avoid more severe consequences. The site had to respond quickly to a 60-day notice of intent to sue€”this presentation details what they did, what they discovered, and how they brought the facility into compliance. For more resources and training materials, visit: www.wastormwatercenter.org
Document Tag: PowerPoint
Slide deck or presentation used for training, outreach, or technical explanation
Basic Building Block of the Industrial Stormwater General Permit
Note: this information was created for a now expired permit. Much of the information is still relevant but specifics should be verified with the current ISGP