Skip to content

ISGP Case Study: Managing Multiple Benchmark Exceedances

ISGP Case Study: Managing Multiple Benchmark Exceedances

In this case study, we welcome in Molly Alar, senior consultant at Parametrix, as she presents on a real-world example of a facility struggling to meet the requirements of Washington’s Industrial Stormwater General Permit (ISGP). Molly walks us through how her team supported a food manufacturing site that faced multiple benchmark exceedances, including copper, zinc, turbidity, and visible oil and grease. You’ll hear how they addressed issues such as poor BMP implementation, missed sampling, and gravel storage yards by implementing targeted operational changes, which led to significant improvements in stormwater quality.

Watch the Presentation:

Case Study at a Glance:

About the Presenter:

Headshot of Molly Alar

Molly Alar is an experienced environmental professional specializing in regulatory compliance for industrial stormwater. Her expertise includes regulatory support for industrial stormwater and wastewater permitting and compliance; SPCC plan preparation and management; air operating permit compliance; and waste designation and management. Molly helps clients address stormwater permit violations and third-party lawsuits by developing site-specific solutions to achieve compliance. With a background working in environmental laboratories, biotech, research, and consulting, Molly combines technical knowledge with practical solutions to help clients reach and maintain compliance.