COURSE MATERIALS FROM PREVIOUS YEARS OF TRAININGS
Introductory Trainings –
Module 1.0 and 2.2 are not required for the certificates.
Module 1.0 – Introduction to LID for Eastern Washington (Not required)
· Course Videos: Module 1.0 – Introduction to LID for Eastern Washington
· Powerpoint slides (PDF format)
· Resource List
Module 2.1 – Introduction to LID for Inspection and Maintenance Staff
· Operations & Maintenance Certificate seekers must review materials and pass the online assessment
· Powerpoint slides (PDF format)
· Resource List
Module 2.2 – Introduction to LID for Developers and Contractors: Make Money be Green (Not required)
· Course Videos: Module 2.2 – Introduction to LID for Developers and Contractors: Make Money be Green
· Powerpoint slides (PDF format)
· Resource List
Intermediate Trainings
Module 3.1 is not required for the Design Certificate
Module 3.1 – Intermediate LID Topics: NPDES Phase I and Phase II Permit Requirements
· Powerpoint slides (PDF format)
· Resource List
Module 3.2 – Intermediate LID Design: Bioretention (Western Washington)
. Course Videos: Module 3.2 – Intermediate LID Design – Bioretention
· Powerpoint slides (PDF format)
· Resource List
Module 3.2 – Intermediate LID Design: Bioretention (Eastern Washington)
· Powerpoint slides (PDF format)
· Resource List
Module 3.3 – Intermediate LID Design: Permeable Pavement
· Course Videos: Module 3.3 – Intermediate LID Design: Permeable Pavement
· Powerpoint slides (PDF format)
Supplemental Material-
· Permeable Interlocking Concrete Pavement Design and Construction Presentation (PDF format)
· Porous Asphalt: Design and Construction Presentation (PDF format)
· Paragon Industries Hard Surface Cleaning Professionals Presentation (PDF format)
· Resource List
Module 3.4 – Intermediate LID Topics: Site Assessment, Planning, and Layout (Western Washington)
· Course Videos: Module 3.4 – Intermediate LID Design: Site Assessment, Planning, and Layout
· Powerpoint slides (PDF format)
· Resource List
Module 3.4 – Intermediate LID Topics: Site Assessment, Planning, and Layout (Eastern Washington)
· Powerpoint slides (PDF format)
· Resource List
Module 3.5 – Intermediate LID Design: Rainwater Collection Systems and Vegetated Roofs
· Course Videos: Module 3.5 – Intermediate LID Design: Rainwater Collection Systems and Vegetated Roofs
· Powerpoint slides (PDF format)
· Resource List
Module 3.6 – Intermediate LID Design: Hydrologic Modeling
· GSI Calculator Example
· Worksheets
· Powerpoint slides (PDF format)
· Resource List
Advanced Trainings
Modules 5.2 – 6.2 are not required for the certificates
Module 5.0 – Advanced Long-term LID Operations: Bioretention
· Powerpoint slides (PDF format)
· Resource List
Module 5.1 – Advanced Long-term LID Operations: Permeable Pavement (Western Washington)
· Powerpoint slides (PDF format)
· Resource List
Module 5.1 – Advanced Long-term LID Operations: Permeable Pavement (Eastern Washington)
· Resource List
Module 5.6 – Advanced LID Design: Hydrologic Modeling
· Worksheet Packet
· Exercise 3 Figures
· Powerpoint slides (PDF format)
Module 6.2 – Advanced LID Design: Bioretention Media and Compost Amended Soils
(Western Washington)
· Powerpoint slides (PDF format)
Presentation 1
Presentation 2
Presentation 3
Module 6.2 – Advanced LID Design: Bioretention Media and Compost Amended Soils
(Eastern Washington)
· Powerpoint slides (PDF format)
Presentation 1
Presentation 2
Presentation 3
Field Videos ( Supplemental Material )
The field videos provide concise, practical information for various LID applications.
- LID Construction in Seattle: TESC (Temporary Erosion and Sediment Control) in the Piper Creek Watershed
- Greenroof Retrofit, Lessons Learned: Out with the Old and in with the New
- Low Impact Development Retrofit: Neighborhood Scale Community Involvement
- Rain Water Catchment—Living off of the Water Grid
- Low Impact Development in Bellingham: A Myriad of Applications